Inning casting construction spur dike construction method in strong tidal bore area

A tidal surge and regional technology, applied in construction, infrastructure engineering, coastline protection, etc., can solve problems such as stone erosion and slow progress of embankments, and achieve the effects of preventing dam erosion, improving efficiency, and reducing construction costs

Active Publication Date: 2014-02-12
ZHEJIANG JIANGNANCHUN CONSTR GRP
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The current construction method adopts the occupation method to unload and throw rocks regardless of the high tide or the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Inning casting construction spur dike construction method in strong tidal bore area
  • Inning casting construction spur dike construction method in strong tidal bore area
  • Inning casting construction spur dike construction method in strong tidal bore area

Examples

Experimental program
Comparison scheme
Effect test
No Example Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an inning casting construction spur dike construction method in a strong tidal bore area. The method comprises the following steps of (a), construction preparing; (b) stone exploiting; (c) measuring and staking out; (d) in-position of dump tucks and barges; (e) performing bottom protection by casting of the barges; (f) propelling by small spring tides; (g) widening and heightening by large spring tides; (h) protecting the slopes of two sides of a spur dike by casting of the barges and extending to perform the bottom protection. According to the inning fusing construction spur dike construction method in the strong tidal bore area, the wastage rate of rocks when the rocks are cast in the strong tidal bore area is reduced, the dike stability is kept, the work period is shortened, the construction progress is accelerated, the environment is protected, massive manpower and labor and investment of machinery equipment are saved, the engineering construction cost is reduced, and when the spur dike is built, the bottom protection is performed firstly by the casting of the barges to prevent the earthwork of the dike head from degradation, and the wastage of the rocks of the dike head caused by washing of spring tides is reduced.

Description

technical field [0001] The invention relates to a construction method of a riprap spur dam. Background technique [0002] With the promulgation and implementation of a series of regulations and regulations such as the "Regulations on the Management of Tidal Flat Reclamation in Zhejiang Province" and the "Overall Plan for Tidal Flat Reclamation in Zhejiang Province", tidal flat reclamation has been included in the administrative licensing items stipulated by Zhejiang Province, and tidal flat reclamation in Zhejiang Province has gradually embarked on Legalization, standardization and scientific road. The Xiaoshan River Control Project is located in the area with the strongest tidal surge of the Qiantang River. The riverbed is low and it is close to the deep river. It is necessary to carry out deep water siltation promotion in the strong tidal surge area. Difficulty and many other practical difficulties. The current construction method adopts the occupation method to unload a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02B3/06E02D15/10
Inventor 王伟锋方华美徐斌狄建刚顾林锋刘学应
Owner ZHEJIANG JIANGNANCHUN CONSTR GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products