Homogeneity dike flood detection and analysis method
An analysis method and technology that needs to be analyzed, applied in water conservancy projects, water conservancy engineering equipment, construction, etc., can solve problems such as strong professionalism and lack of dike management analysis methods, and achieve the effect of low cost, reduced management cost, and simple operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0017] 1. Drilling: One set of DPP-1003B drilling rig is used, the rotary method is used for drilling, the wall is protected by mud, and the footage is carried out in strict accordance with the requirements of the specification. Due to the existence of a plain fill layer on the site, a casing retaining wall shall be installed after passing through the fill layer, and drilling with clear water shall not exceed 2.00m per return.
[0018] 2. Sampling: Soil samples are mainly collected in layers. The Ф110 soil lifting drill is drilled, and the undisturbed soil samples are taken by the static pressure method with the double-cone live valve type soil extractor, sealed and labeled in time, and sent to the geotechnical laboratory for opening. sample test.
[0019] 3. In-situ test: The standard penetration test adopts the free-fall hammer method with automatic decoupling, and is implemented in strict accordance with the operating procedures.
[0020] 4. Borehole water injection test: ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
