Artificial beach volleyball court and construction method
A construction method and technology for a volleyball court, applied in the directions of roads, pavements, roads, etc., can solve the problems of unsatisfactory water conduction and drainage, complex construction structure, low site quality, etc., to prevent the breeding of bacteria, good hydrophobic effect, Simple construction method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] An artificial beach volleyball field, comprising a beach volleyball court body 1 and a water guide ditch 2, the beach volleyball court body 1 is surrounded by a water guide ditch 2, and the function of the water guide ditch 2 is to guide water out of the beach volleyball court body 1 There are wall masonry 5 on both sides of the water diversion ditch 2, which plays the role of protecting and standardizing the beach volleyball court body 1; Field body 1 has a protective function to prevent subsidence; the bottom of the water diversion ditch 2 is poured with a concrete layer 6 with a thickness of 100mm and a slope ratio of 60mm%m, that is, the slope ratio is poured at a drop of 60mm per 100 meters; the beach volleyball court body 1 It includes a hydrophobic layer and a 500mm thick sea sand layer 3 covering the top of the hydrophobic layer. The hydrophobic layer extends to the inner side of the wall masonry 5 and is flush with it. .
[0037] The hydrophobic layer consists...
Embodiment 2
[0057] An artificial beach volleyball field, comprising a beach volleyball court body 1 and a water guide ditch 2, the beach volleyball court body 1 is surrounded by a water guide ditch 2, and wall masonry 5 is built on both sides of the water guide ditch 2, and the wall masonry 5. Reinforcing columns (not shown in the figure) are arranged every two meters; the concrete layer 6 with a thickness of 80mm and a slope ratio of 40mm%m is poured in place at the bottom of the water diversion ditch 2, that is, the slope ratio is 40mm per hundred meters. Pouring; the beach volleyball court body 1 includes a hydrophobic layer and a 400mm thick sea sand layer 3 covered above the hydrophobic layer, the hydrophobic layer extends to the outside of the wall masonry 5 and is flush with it, and the water in the sea sand layer 3 is channeled through the hydrophobic layer 3 1. The wall masonry 5 infiltrates and flows to the gutter 2 for export.
[0058] The hydrophobic layer is composed of upper...
Embodiment 3
[0076] An artificial beach volleyball field, comprising a beach volleyball court body 1 and a water guide ditch 2, the beach volleyball court body 1 is surrounded by a water guide ditch 2, and wall masonry 5 is built on both sides of the water guide ditch 2, and the wall masonry 5. Reinforcing columns (not shown in the figure) are arranged every two meters; the concrete layer 6 with a thickness of 120mm and a slope ratio of 70mm%m is poured in place at the bottom of the water diversion ditch 2, that is, the slope ratio is 70mm per hundred meters. Pouring; the beach volleyball court body 1 includes a hydrophobic layer and a 600mm thick sea sand layer 3 covering the top of the hydrophobic layer, and the hydrophobic layer extends to the wall masonry 5 and is flush with it.
[0077] The hydrophobic layer consists of upper and lower layers, the lower layer is a concrete layer 7 with a thickness of 150mm and a slope ratio of 70mm%m, and the upper layer is a permeable layer with a thi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com