Construction method for newly-built large deep foundation pit basements under protection building

A construction method and basement technology, applied in construction, building maintenance, building construction, etc., can solve problems such as the quality and efficiency of basement construction in unfavorable surrounding environments, increase the possibility of cracking of protected buildings, and reduce the structural strength of protected buildings, etc., to achieve It is beneficial to control the stability of the surrounding environment, reduce the exposure time of the foundation pit, and protect the surrounding environment

Inactive Publication Date: 2015-12-02
SHANGHAI YUBANG CONSTR ENG CO LTD
View PDF4 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the existing construction method of building a new large-scale deep foundation pit basement under a protected building has many construction steps, a long construction period, and a long time for the foundation pit to be exposed, which is not conducive to the stability of the surrounding environment and the quality and efficiency of basement construction. , In addition, the construction of the partition underground diaphragm wall will also cause vertical and horizontal stress effects on the protected building, thereby reducing the structural strength of the protected building and increasing the possibility of cracking of the protected building, which is even more unfavorable to the protection of the protected building

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for newly-built large deep foundation pit basements under protection building
  • Construction method for newly-built large deep foundation pit basements under protection building
  • Construction method for newly-built large deep foundation pit basements under protection building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] Below in conjunction with accompanying drawing and specific embodiment, the construction method of new large-scale deep foundation pit basement proposed by the present invention will be further described in detail. Advantages and features of the present invention will be apparent from the following description and claims. It should be noted that the drawings are all in a very simplified form and use imprecise ratios, which are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.

[0051]The core idea of ​​the present invention is to provide a construction method for building a large-scale deep foundation pit basement under a protected building. The construction method translates a relatively mature building within a limited base range without demolishing the protected building. The technology is combined with the foundation pit construction of the top-down method. After the protected building and the basement r...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction method for newly-built large deep foundation pit basements under a protection building. According to the construction method, on the premise that the protection building is not disassembled, within a limited foundation range, a mature building translation technology and a reverse foundation pit construction method are combined, and overall construction of the first-region and second-region basements is directly performed after the protection building and a top plate of the first-region basement are connected in an anti-seismic butt joint mode. On the basis of guaranteeing structural stability of the protection building, construction working conditions and construction steps of the basements are reduced, the construction period is shortened, safety and stability of the protection building are improved, overall construction quality and efficiency are improved, ambient environment is effectively controlled, the number of dividing strips between first and second regions is reduced, and time benefits, space benefits and stable benefits are maximized.

Description

technical field [0001] The invention relates to the construction field, in particular to a construction method for building a large-scale deep foundation pit basement under a protected building. Background technique [0002] At present, the translation technology of housing engineering (including structures, etc.) generally adopts underpinning forms such as upper sliding beams and lower beams, and the translation is carried out after the structure is consolidated. According to the overall weight of housing engineering (including structures, etc.), the foundation form is determined, and the basic translation is to On newly built pile foundations, piled raft foundations and strip foundations. [0003] However, the construction method of building a new large-scale deep foundation pit basement under a protected building (with a certain historical age and historical value, such buildings or structures that do not consider demolition, need to be protected, or preserved), consideri...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/045E04G23/06
Inventor 叶军惠朱露敏
Owner SHANGHAI YUBANG CONSTR ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products