A technology of static penetration and construction technology, which is applied in basic structure engineering, construction, on-site foundation soil survey, etc. It can solve problems such as difficulty in anchoring, damage to large-area road surfaces, casualties, etc., and achieves small damage to the road surface, Effect of reducing social impact and construction noise
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] A construction technique of static penetrating sounding of urban road pavement, the concrete steps comprising:
[0021] 1) Positioning and setting out: firstly, collect and analyze the data of underground pipelines, and fully understand the distribution of underground pipelines. The influence of the surface buildings (structures) can be shifted after the approval of the design and supervision, and the maximum distance of shifting is 2m. For the shifted drilling position, the work of signing the shift record shall be done well.
[0022] 2) Drilling: Use a Φ73mm drilling water drill at the position where the wire has been laid out to drill holes in the pavement surface and water stabilization layer, and drill the drill until the undisturbed soil under the road surface is exposed. During the drilling process of water drilling, it should be ensured that the drill bit is vertically downward, and protective measures should be taken after the drilling is completed.
[0023] ...
Embodiment 2
[0028] A construction technique of static penetrating sounding of urban road pavement, the concrete steps comprising:
[0029] 1) Positioning and setting out: firstly, collect and analyze the data of underground pipelines to fully understand the distribution of underground pipelines, and then use a total station to carry out on-site measurement and setting out according to the coordinates of the designed drilling holes. The actual position error of the drilling holes is 0.4m; due to the underground pipelines, The influence of the surface buildings (structures) can be shifted after approval of the design and supervision, and the shift distance is 1.5m. For the shifted drilling position, the work of signing the shift record shall be done well.
[0030] 2) Drilling: Use a Φ73mm drilling water drill at the position where the wire has been laid out to drill holes in the pavement surface and water stabilization layer, and drill the drill until the undisturbed soil under the road sur...
Embodiment 3
[0036] A construction technique of static penetrating sounding of urban road pavement, the concrete steps comprising:
[0037] 1) Positioning and setting out: firstly, collect and analyze the data of underground pipelines to fully understand the distribution of underground pipelines, and then use a total station to carry out on-site measurement and setting out according to the coordinates of the designed drilling holes. The actual position error of the drilling holes is 0.4m; due to the underground pipelines, The influence of the surface buildings (structures) can be shifted after approval of the design and supervision, and the shift distance is 1.5m. For the shifted drilling position, the work of signing the shift record shall be done well.
[0038] 2) Drilling: Use a Φ73mm drilling water drill at the position where the wire has been laid out to drill holes in the pavement surface and water stabilization layer, and drill the drill until the undisturbed soil under the road sur...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com