Construction method and structure of prestressed assembled submerged indoor basement
A construction method and prestressing technology, applied in the directions of underwater structures, infrastructure engineering, artificial islands, etc., to improve the overall stiffness, control the sinking speed, and correct the deflection of components
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention will be further described below in conjunction with the accompanying drawings.
[0042] Such as Figure 1 to Figure 14 The construction method of the prestressed assembled submerged indoor basement includes the following steps: a. Firstly, the components 12 of the underground space structure are pre-standardized and produced in the factory. Determine the steel bar layout and quantity of the prefabricated component 12 according to the characteristics of the project; b. Carry out setting-out positioning in the room of the warehouse 3, and then arrange the bolt holes 1 evenly along the sideline of the underground space and bury the bolt underground along the bolt holes 1 11. The anchorage section at the bottom of the anchor 11 is grouted to form an anchor body 15, and the anchor drilling has the functions of geological exploration and construction monitoring; c. After reliable connection, the prefabricated components 12 are sequentially inserted into...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com