Pre-cast wall plate structure

A pre-cast, wall panel technology, applied in the direction of walls, building components, building structures, etc., can solve the problems of lengthening construction time, lengthening man-hours, affecting construction progress, etc. The effect of shortened working hours

Inactive Publication Date: 2017-05-10
NINGBO PINGHAI BUILDING MATERIALS
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Among them, the calculation of raw materials, transportation and replenishment operations, site environment and climate, construction site restrictions, and the professional quality of construction personnel will all affect the quality of construction, and what is more, these factors will cause delays in construction progress.
[0003] In addition, after the grouting and filling operation is completed, the concrete needs to be cured, and the maintenance also needs to lengthen the construction time, and the defects generated during the grouting and filling operation
In the process of explaining the grouting and filling operation, it is limited by many factors, which will lengthen the working hours, increase the construction cost and affect the construction quality
In addition, the grouting wall panel site is a high-risk working environment for construction personnel. Construction work in an unstable and unsafe workplace will not only cause inconvenience and safety concerns, but also affect the construction progress.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pre-cast wall plate structure
  • Pre-cast wall plate structure
  • Pre-cast wall plate structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] In conjunction with the accompanying drawings, the present invention will be described in further detail.

[0017] A precast wall panel structure, comprising a bottom plate 20, a first component 40, a second component 60, a third component 50, and a fourth component 70, characterized in that the first component 40 is arranged on one side of the bottom plate 20, and the second The component 60 is arranged on the other side of the bottom plate 20;

[0018] 3. One side of the third member 50 is connected to one side of the first member 40, and the other side is connected to one side of the second member 60, and the third member 50 is arranged on the bottom plate 20 orthogonally to the first member 40 and the second member 60; One side of the fourth member 70 is connected to the other side of the first member 40 , and the other side is connected to the other side of the second member 60 , and the fourth member 70 is arranged on the bottom plate 20 orthogonally to the first ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pre-cast wall plate structure. The pre-cast wall plate structure comprises a bottom plate, a first component, a second component, a third component and a fourth component and is characterized in that the first component is arranged on one side of the bottom plate; the second component is arranged on the other side of the bottom plate; one side of the third component is connected with one side of the first component; the other side of the third component is connected with one side of the second component; the third component is orthogonal with the first component and the second component on the bottom plate; one side of the fourth component is connected with the other side of the first component; the other side of the fourth component is connected with the other side of the second component; the fourth component is orthogonal with the first component and the second component on the bottom plate; the first component is opposite to the second component; the third component is opposite to the fourth component; the first component, the second component, the third component, the fourth component and the bottom plate are encircled to form an accommodating space. The pre-cast wall plate structure has the beneficial effects that the construction is convenient and rapid, the construction period is shortened, the cost is reduced, the weight of the wall can be reduced, and the structure is safe, waterproof, fireproof and heatproof.

Description

technical field [0001] The invention relates to a wall panel structure, in particular to a precast wall panel structure. Background technique [0002] The traditional wallboard construction method measures and plans the construction process at the construction site, and then lays the grouting wallboard on the construction site according to the facilities required for grouting wallboard (such as columns, channel irons, skeletons, outer panels, etc.) for grouting to fill the space. Among them, the calculation of raw materials, transportation and repair operations, site environment and climate, construction site restrictions, and the professional quality of construction personnel will all affect the quality of construction, and what's more, these factors will also lead to delays in construction progress. [0003] In addition, after the grouting and filling operation is completed, the concrete needs to be cured, and the maintenance also needs to prolong the construction time, an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B2/86
CPCE04B2/8635
Inventor朱籽臻
OwnerNINGBO PINGHAI BUILDING MATERIALS