Method for automatically pre-arranging annual overhaul plan of rail transit equipment based on repair program

A technology of maintenance planning and rail transit, applied in the direction of calculation, instrumentation, data processing applications, etc., can solve problems such as low work efficiency, unreasonable arrangement, low maintenance and economical efficiency of equipment maintenance, and improve the level of equipment maintenance, The effect of improving management level

Inactive Publication Date: 2017-06-13
NARI TECH CO LTD +1
View PDF5 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, at present, the formulation of the annual maintenance plan is mainly done manually. The work efficiency is not high, the arrangement is not reasonable enough, and the maintainability and economy of equipment maintenance are not high.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for automatically pre-arranging annual overhaul plan of rail transit equipment based on repair program
  • Method for automatically pre-arranging annual overhaul plan of rail transit equipment based on repair program

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The technical scheme of the present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments, so that those skilled in the art can better understand the present invention and implement it, but the examples given are not intended to limit the present invention.

[0031] Such as figure 1 As shown, the automatic pre-arrangement method for the annual maintenance plan of rail transit equipment based on the repair schedule includes the following steps:

[0032] Step 1. Input the annual maintenance plan template, equipment information form, historical maintenance records and repair schedule.

[0033] The annual maintenance plan template is a template set according to actual needs, and it is an empty table with header content, such as figure 2 As shown, the table header contains the content required for the annual maintenance schedule. Generally, multiple templates of the annual maintenance schedule that may be...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for automatically pre-arranging an annual overhaul plan of rail transit equipment based on a repair program. The method comprises the steps of 1, inputting an annual overhaul plan table template, an equipment information table, a historical overhaul record and a repair program table; 2, calling out the annual overhaul plan table template; 3, filling the annual overhaul plan table template: screening out all overhaul equipment belonging to a line and a profession from the equipment information table, reading overhaul information corresponding to the overhaul equipment from the overhaul table, and filling the annual overhaul plan table template with the overhaul equipment and the corresponding overhaul information; 4, establishing a target function and constraint conditions; 5, generating an initial annual overhaul plan according to the target function and the constraint conditions through the filled annual overhaul plan table template, and allocating overhaul tasks of a whole year to 12 months; and 6, auditing the initial annual overhaul plan, and taking the annual overhaul plan passing the audit as a final annual overhaul plan. Therefore, the repairability and economy of equipment overhaul are improved.

Description

technical field [0001] The invention relates to an automatic prearrangement method for the annual maintenance plan of rail transit equipment based on the maintenance schedule. Background technique [0002] Rail transit is a typical equipment-intensive industry, with a large number of equipment, involving many specialties, including power supply, vehicles, signals, etc., and has relatively high safety requirements. my country is currently in a period of great development of urban rail transit, and a large number of lines are continuously opened for operation. Once a rail transit project is put into operation, the entire system must be kept in normal operation around the clock. The normal operation of the entire system must be premised on and guaranteed by the safe operation of the equipment. . In order to ensure the safe and sound operation of all equipment in the system, there must be a set of effective maintenance programs that can coordinate various disciplines. [0003] ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/00G06Q50/30
CPCG06Q10/06312G06Q10/06316G06Q10/20G06Q50/30
Inventor 孙佳佳张昆朱微维崔伟吴永城李聪
Owner NARI TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products