A BIM-based information management method for high-speed railway precast beam yards

A technology for high-speed railways and beam yards, applied in office automation, data processing applications, electrical digital data processing, etc., can solve problems such as inaccurate management information transmission, achieve accurate communication, save labor costs, and speed up construction progress

CN106991214AInactive Publication Date: 2017-07-28CHINA TIESIJU CIVIL ENG GRP CO LTD +1
6 Cites 11 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2017-07-28
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention provides a BIM-based information management method for high-speed railway precast beam yards and belongs to the technical field of railway beam yards. The method comprises the steps of: based on BIM technology, BIM models for box beams in a high-speed railway precast beam yard is built; a server end generates beam yard construction procedure tasks according to beam erection construction organization information of the beam yard; the server end sends the generated procedure tasks to a client so that the client can perform initiating or closing operations on the received procedure tasks; the server end receives information of the initiating or closing operations executed for the procedure tasks sent by the client and hitches the information to the BIM model of a box beam with the corresponding serial number. The method establishes a server end and a client for practical production management of a beam yard based on BIM technology to complete issuing and uploading of production plans, so that the requirements for accurate and rapid transmission of construction production information are met.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of railway beam yards, in particular to an information management method for high-speed railway prefabricated beam yards based on BIM. Background technique

[0002] At present, the production management of railway prefabricated beam yards is mainly based on language communication such as mobile phones, that is, the upload and release of construction and production tasks from the upper and lower levels by "man-management". This traditional management method has some very serious defects: low efficiency of information transmission, large errors, misleading information caused by interference from external elements, etc. Especially in the current situation of heavy construction and production tasks and tight construction schedules, how to reasonably arrange the connection between construction and production tasks and processes is the top priority. Moreover, with the factoryization, standardization, and standard...

Examples

Embodiment Construction

[0012] Combine below Figure 1 to Figure 2 Shown, the present invention is described in further detail.

[0013] Such as figure 1 As shown, this embodiment discloses a BIM-based high-speed railway prefabricated beam field information management method, the method includes the following steps S1 to S4:

[0014] S1. Based on BIM technology, establish the BIM model of the box girder in the high-speed railway prefabricated beam field;

[0015] S2. The server side generates the beam yard construction process task according to the beam yard erection group information;

[0016] S3. The server sends the generated process task to the client so that the client initiates or closes the received process task;

[0017] S4. The server side receives the information sent by the client terminal to initiate or close the process task, and mounts the information on the BIM model of the corresponding numbered box girder according to the principle of number correspondence.

[0018] It should be ...