A BIM-based information management method for high-speed railway precast beam yards
A technology for high-speed railways and beam yards, applied in office automation, data processing applications, electrical digital data processing, etc., can solve problems such as inaccurate management information transmission, achieve accurate communication, save labor costs, and speed up construction progress
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-07-28
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to the technical field of railway beam yards, in particular to an information management method for high-speed railway prefabricated beam yards based on BIM. Background technique
[0002] At present, the production management of railway prefabricated beam yards is mainly based on language communication such as mobile phones, that is, the upload and release of construction and production tasks from the upper and lower levels by "man-management". This traditional management method has some very serious defects: low efficiency of information transmission, large errors, misleading information caused by interference from external elements, etc. Especially in the current situation of heavy construction and production tasks and tight construction schedules, how to reasonably arrange the connection between construction and production tasks and processes is the top priority. Moreover, with the factoryization, standardization, and standard...
Examples
Embodiment Construction
[0012] Combine below Figure 1 to Figure 2 Shown, the present invention is described in further detail.
[0013] Such as figure 1 As shown, this embodiment discloses a BIM-based high-speed railway prefabricated beam field information management method, the method includes the following steps S1 to S4:
[0014] S1. Based on BIM technology, establish the BIM model of the box girder in the high-speed railway prefabricated beam field;
[0015] S2. The server side generates the beam yard construction process task according to the beam yard erection group information;
[0016] S3. The server sends the generated process task to the client so that the client initiates or closes the received process task;
[0017] S4. The server side receives the information sent by the client terminal to initiate or close the process task, and mounts the information on the BIM model of the corresponding numbered box girder according to the principle of number correspondence.
[0018] It should be ...