Control system for combined drainage pipe network without sewage trunk pipe and control method of control system
A technology of drainage pipe network and control system, which is applied in the direction of sewer system, waterway system, sewage removal, etc., can solve the problem of inability to realize sewage and rainwater treatment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0112] This embodiment provides a combined drainage pipe network control system for non-sewage mains, which includes:
[0113] Rainwater main pipe 12, one or more unit areas 1, water treatment system, integrated treatment facility 4;
[0114] Each unit area is provided with a rain and sewage pipe 5; the outlet of the rain and sewage pipe 5 is provided with a water treatment system, and the first outlet of the water treatment system is provided with a first sewage discharge pipe 9 connected to the entrance of the integrated treatment facility 4 , the second outlet of the water treatment system is provided with a first rainwater discharge pipe 6 connected to the rainwater main pipe 12, and the third outlet of the water treatment system is provided with a second rainwater discharge pipe 7 connected with the rainwater main pipe 12;
[0115] The outlet end of the integrated treatment facility is provided with a third rainwater discharge pipe 8 connected to the main rainwater pipe; ...
Embodiment 2
[0125] This embodiment provides a combined drainage pipe network control system for non-sewage mains, which includes:
[0126] Rainwater main pipe 12, one or more unit areas 1, water treatment system, integrated treatment facility 4; rain and sewage pipeline 5 is arranged in each unit area; the outlet of described rain and sewage pipeline 5 is provided with water treatment system, and the The first outlet of the water treatment system is provided with the first sewage discharge pipe 9 connected to the entrance of the integrated treatment facility 4, and the second outlet of the water treatment system is provided with the first rainwater discharge pipe 6 connected with the rainwater main pipe 12. The third outlet of the water treatment system is provided with a second rainwater discharge pipe 7 connected to the rainwater main pipe 12; the outlet end of the integrated treatment facility is provided with a third rainwater discharge pipe 8 connected with the rainwater main pipe.
...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com