Channel reservoir construction influence pre-assessment method
A pre-assessment, reservoir technology, applied in the field of pre-assessment, which can solve problems such as incomplete identification of hydrodynamics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0105] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0106] Taking a certain river channel reservoir in the mountainous area of southern China as an example, the processing process of the implementation method of the present invention is illustrated.
[0107] 1. Data collection and ground investigation
[0108] Collection of geographical data: remote sensing image data in the catchment area of river-type reservoirs (spatial resolution ≥ 10m), high-resolution (spatial resolution ≤ 2.5m) remote sensing image data, DEM elevation data;
[0109] Collection of hydrometeorological data: rainfall, temperature, relative humidity, and wind speed data of meteorological stations in catchment areas of river-type reservoirs, and flow data of hydrological stations at dam sites of river-type reservoirs;
[0110] Collect water conservancy dispatching data: technical design report of river-type reservoirs, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com