Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method and system for evaluating the operation benefits of a power transmission grid project

A technology for power delivery and benefit evaluation, applied in the field of power grid transmission, can solve problems such as coarse granularity, failure to fully consider the main role of the project, and failure to set evaluation standards, achieving scientific weight determination methods, clear evaluation standards, and strong pertinence Effect

Active Publication Date: 2021-12-07
STATE GRID ECONOMIC TECH RES INST CO +1
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the different functions of power transmission and transformation projects in the power grid, their evaluation indicators and evaluation standards should be focused and different. Electricity demand projects have high requirements for load rate, and use unified indicators and standards to evaluate all projects, ignoring the functional attributes of projects, and cannot provide targeted suggestions for the follow-up construction of such projects. This evaluation method It cannot fully reflect whether the fundamental goal of project construction is realized; the other is to divide power grid engineering projects into public network projects, special power transmission and transformation projects, and networking projects, and divide their roles in the power grid from the spatial and physical aspects of the project. Different evaluation indicators are set for each project to evaluate project operation benefits. This type of evaluation method has a coarse granularity and does not fully consider the main role of the project in the power grid. As a result, the evaluation results deviate from the main problems to be solved by the project construction. Provide reference for the operation and construction of this kind of project in the future
In addition, the indicators involved in the above two methods have no set evaluation standards, and the evaluation process is highly subjective.
To sum up, so far, there has been no research on building an evaluation system for power transmission grid projects, proposing evaluation indicators, and clarifying evaluation criteria from the perspective of different project system functions.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and system for evaluating the operation benefits of a power transmission grid project
  • A method and system for evaluating the operation benefits of a power transmission grid project
  • A method and system for evaluating the operation benefits of a power transmission grid project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0067] Such as figure 1 As shown, the method for evaluating the operation benefit of the power grid project proposed by the present invention includes the following contents:

[0068] 1. Collect the actual operating power data of a power grid project that needs to be evaluated.

[0069] 2. Evaluate the project performance of the power grid project based on the collected power data. The project performance evaluation indicators include the proportion of the system for the number of new lines, the proportion of the system for the length of new lines, the proportion of the system for the capacity of new units and buckle For current verification, the specific evaluation process of each evaluation index on project performance is as follows:

[0070] 1) The proportion of the system in the number of new lines

[0071] Calculate the ratio K of the number of new lines to the number of system lines l1 , to evaluate the contribution effect of the number of new lines in this project to...

Embodiment 2

[0249] Based on the same inventive concept, the present invention also provides a system for evaluating the operation benefits of power grid projects, which is characterized in that the system includes:

[0250] A data collection module used to collect the power data of the actual operation of the power grid project to be evaluated;

[0251] A project performance evaluation module for evaluating the project performance of the power transmission grid project based on the collected power data;

[0252] A project effect evaluation module used to evaluate the project effect of the power grid project based on the collected power data;

[0253] A project safety evaluation module used to evaluate the project safety of the power grid project based on the collected power data;

[0254] A comprehensive evaluation module for comprehensively evaluating the operation benefits of the power grid project based on the evaluation results of project efficiency, project effect and project safety...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to a method and system for evaluating the operation benefits of a power grid project, which includes the following contents: collecting the actual operation power data of a certain power grid project to be evaluated; Evaluation; Evaluate the project effect of the power grid project based on the collected power data; Evaluate the project safety of the power grid project based on the collected power data; According to the evaluation results of project effectiveness, project effect and project safety, Comprehensive evaluation of the operational benefits of the power grid project.

Description

technical field [0001] The invention relates to a method and system for evaluating the operation benefit of a power grid project for power transmission, and relates to the technical field of power grid transmission. Background technique [0002] At present, there are usually two types of methods for evaluating the operational benefits of power grid engineering projects. One is to use the same set of index systems to evaluate the operational benefits of power grid engineering projects of all functional types. Due to the different functions of power transmission and transformation projects in the power grid, their evaluation indicators and evaluation standards should be focused and different. Electricity demand projects have high requirements on load rate, and use unified indicators and standards to evaluate all projects, ignoring the functional attributes of projects, and cannot provide targeted suggestions for the follow-up construction of such projects. This evaluation meth...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06393G06Q50/06Y02E40/70Y04S10/50
Inventor 张恒郑燕雷体钧温卫宁汪亚平易文飞邵黎陈立谭凌峰何砚李如萍吕岳翟树军杨丽萍彭婧胡本哲张轶姿
Owner STATE GRID ECONOMIC TECH RES INST CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products