A floating highway
A technology for highways and roads, applied in roads, pontoon bridges, roads, etc., can solve the problems of bridges not necessarily applicable, many safety hazards, and extended construction period, and achieve the effects of recyclable maintenance, high design safety factor, and accelerated construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as Figure 1 ~ Figure 2 As shown, a kind of expressway floating on sea according to the present invention comprises a large number of suspension box bridges floating on the sea surface, the middle part of the top of the suspension box bridge is the road surface, and the two sides of the top are guardrails. A number of suspended box bridges are connected end to end in turn, so that the road surfaces of the suspended box bridges are connected to each other to form a highway connecting the two banks.
[0046] Such as figure 1 As shown, each suspension box bridge includes the following components:
[0047] A road main body 1 floating on the sea, the top of the road main body 1 is composed of highway road surface.
[0048] At least two barrier outer layers 2 float on the sea surface and are respectively placed on both sides of the road main body 1 to form a protective barrier. At the same time, the barrier outer layers 2 on both sides are fixedly connected to each ot...
Embodiment 2
[0062] The structure of the floating expressway in Embodiment 2 is the same as that in Embodiment 1, except that the anchoring system 3 also includes a side pull gravity seat 32 that limits the left and right floating of the suspended box bridge.
[0063] Such as Figure 4 and Figure 5 As shown, the side pull gravity base 32 is sunk on the seabed and placed on both sides of the balance gravity base 31 respectively, and the outer walls of the two side pull gravity bases 32 are connected by wire ropes. The side-pull gravity seat 32 is a cube made by pouring concrete in a steel mesh. When pouring concrete, some high-strength anchor bolts are evenly buried on the top of the balance gravity seat 31, so that the anchor bolts and the side tension gravity seat 32 are integrally formed.
[0064] The side pull gravity seat 32 can be provided with several according to the length of the suspended box bridge, and each side pull gravity seat 32 is respectively provided with a number of w...
Embodiment 3
[0068] A kind of expressway floating on the sea in this embodiment 3, its structure is the same as that of embodiment 1, the difference is that the opposite inner sidewalls of the two barrier outer layers 2 are respectively arranged as a slope, and the barrier between the outer layers 2 The distance between them decreases gradually from top to bottom.
[0069] Such as Figure 6 As shown, the cross-section of the barrier outer layer 2 is a right-angled trapezoid, and its inner sidewall is an inclined slope 24 . The inner sidewalls of the two barrier outer layers 2 are arranged opposite to each other, so that the distance between the two barrier outer layers 2 gradually decreases from top to bottom until reaching the connecting column 23 at the bottom. The inner wall of the U-shaped groove formed by the two barrier outer layers 2 is V-shaped. The reason for this arrangement is that when the floating body 12 collapses, the bridge deck 11 loses buoyancy, and the bridge deck 11 is...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com