An earth and rockfill dam construction period flood season risk detection system and a detection method thereof
A technology of risk detection and earth-rock dams, applied in the field of dam flood control, can solve the problems of long construction period, complex construction environment, low flood resistance in flood season, etc., and achieve the effect of controlling losses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] refer to figure 1 , a flood risk detection system during the construction period of an earth-rock dam, including:
[0053] Upstream flood level sampling module 1, used to collect upstream flood level data;
[0054] Weir crest elevation calculation module 2, used to calculate weir crest elevation data according to upstream flood level data;
[0055] The safety risk analysis module 3 is connected by communication with the upstream flood level sampling module 1 and the weir crest elevation calculation module 2, and is used to calculate the safety risk of flood relief;
[0056] Deterministic cost calculation module 4, used to calculate the cost required to raise the cofferdam;
[0057] Uncertain cost calculation module 5, which is used to calculate the cost of investment completed before the heightening of the flood control cofferdam under the premise of a dam failure;
[0058] The cost risk analysis module 6 is connected with the definite cost calculation module 4 and t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com