A technology of reinforced concrete and construction equipment, applied in the processing of walls, building materials, construction, etc., can solve the problems of construction workers' injuries, cumbersome removal of nails, and unsatisfactory use, so as to avoid injuries, simple disassembly steps, and save time Effect

Active Publication Date: 2020-06-02
CITIC GUOAN CONSTR GRP CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the construction of reinforced concrete shear walls, it is necessary to use wooden formwork to fix the shear wall structure, and then pour concrete to form it. However, the existing wooden formwork fastening methods generally use nails to fasten the wooden formwork. After the geometric size and structure of the shear wall are formed, it is inconvenient to adjust and cannot meet the needs of use, and after the construction is completed, it will be cumbersome to remove the nails, which is easy to cause injury to construction workers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of construction equipment and construction method of reinforced concrete shear wall
  • A kind of construction equipment and construction method of reinforced concrete shear wall
  • A kind of construction equipment and construction method of reinforced concrete shear wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] refer to Figure 1-2 , a construction equipment for a reinforced concrete shear wall, comprising a first fixed plate 1, a support rod 101 connected to the top of the first fixed plate 1, a cylinder 2 connected to the top of the support rod 101, and a pull rod 3 connected to the output end of the cylinder 2 , the top of the first fixed plate 1 is excavated with a through hole matched with the pull rod 3, and the end of the pull rod 3 away from the cylinder 2 passes through the through hole and is connected with the connection box 4, and the inner walls of the connection box 4 on both sides are connected with connection Rod 5, the two ends of the first fixed plate 1 are fixedly connected with the second fixed plate 6, the outer walls of the two second fixed plates 6 are all slidably connected with the sliding plate 7, and the end of the connecting rod 5 away from the connection box 4 is connected with the sliding plate 7 The bottom of the sliding plate 7 is connected with...

Embodiment 2

[0029] refer to Figure 1-4 , a construction equipment for reinforced concrete shear walls, which is basically the same as that of Embodiment 1, furthermore, the outer wall of the second fixed plate 6 is connected with a slide rail 10, and the outer wall of the slide plate 7 is excavated with a matching slide rail 10 Groove 11; the sliding plate 7 is pulled by the connecting rod 5 to make the slide rail 10 slide in the groove 11 more conveniently, which is beneficial to the smooth sliding of the device.

[0030] The outer walls of the two splints 8 are connected with a fixed block 12, and a spring 13 is connected between the two fixed blocks 12; using the elastic characteristics of the spring 13, the splint 8 can be avoided in the process of tightening the wooden formwork 9 by the splint 8. 2 directly acts on wooden formwork 9 under the effect of 2, plays certain cushioning and damping function.

Embodiment 3

[0032] refer to Figure 1-4 , a construction equipment for a reinforced concrete shear wall, which is basically the same as in Example 1, furthermore, the outer wall of the splint 8 is connected with a rubber pad 14, and the outer wall of the rubber pad 14 is provided with anti-slip lines, and the rubber pad 14 is connected to the wooden formwork 9 offset; the wooden formwork 9 can be protected to prevent the wooden formwork 9 from being damaged due to being squeezed during the clamping process, and the outer wall of the rubber pad 14 is provided with anti-skid lines, which can prevent the wooden formwork 9 from being clamped. Shaking during the process is beneficial for the device to better complete the clamping work.

[0033]The wooden formwork 9 is made of bamboo plywood; this formwork has high strength and good toughness, and the static bending strength of the board is equivalent to eight to ten times the strength of wood, which can reduce the number of supports used, and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a reinforced concrete shear wall and a construction method thereof, and belongs to the technical field of civil engineering construction. The reinforced concrete shear wall comprises a first fixing plate, wherein the top of the first fixing plate is connected with a supporting rod, the top of the supporting rod is connected with a cylinder, the output end of the cylinder isconnected with a pull rod, a through hole matched with the pull rod is formed in the top of the first fixing plate, the end, away from the cylinder, of the pull rod penetrates through the through hole and is connected with a connecting box, connecting rods are rotationally connected to the inner walls of the two sides of the connecting box, second fixing plates are fixedly connected to the two ends of the first fixing plate, sliding plates are slidably connected to the outer walls of the two second fixing plates, the ends, away from the connecting box, of the connecting rods are connected with the sliding plates, clamping plates are connected to the bottoms of the sliding plates, and wood formworks are connected to the outer walls of the clamping plates. According to the invention, the cylinder is used for controlling the clamping plates to clamp the wood formworks, the clamping distance between the wood formworks can be adjusted, the use requirement is met, nails are not needed for fixing, and dismounting and mounting are convenient.

Description

technical field [0001] The invention relates to the technical field of civil engineering construction, in particular to a construction equipment and a construction method of a reinforced concrete shear wall. Background technique [0002] In high-rise and super-high-rise building structures, horizontal loads will play a major role. The building needs a large anti-side movement ability, and the anti-side movement ability of the frame structure is weak. Due to the low strength of the wall material and the weight of the hybrid structure, it is limited to It is used in multi-storey buildings, so in the structure of high-rise and super high-rise buildings, a new structural system needs to be adopted, which is the shear wall structure system. The shear wall can be divided into reinforced concrete shear wall and steel plate shear wall according to the structural material. , steel concrete shear walls and reinforced block shear walls, among which reinforced concrete shear walls are t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B2/84E04G21/00
CPCE04B2/84E04G21/00
Inventor 何耀宋闯寇春武寇世军唐建邓欢
Owner CITIC GUOAN CONSTR GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products