Tunnel construction dynamic risk assessment method based on monitoring measurement
A risk assessment and dynamic risk technology, applied in data processing applications, instruments, calculations, etc., can solve the problems of inability to accurately assess the safety status of tunnel construction and difficult to control the safety risks of tunnel construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] The specific process of the dynamic risk assessment method for tunnel construction based on monitoring and measurement involved in this embodiment includes four steps: establishment of system, establishment of grades and standards, description of scoring values and calculation of weight values:
[0033] (1) Establish a system: According to the characteristics of the monitoring and measurement of the tunnel new Austrian method, establish a dynamic risk assessment index system for tunnel construction safety, as shown in the following table:
[0034]
[0035] (2) Establishing grades and standards: Quantitatively analyze the construction status of each risk assessment indicator according to the tunnel monitoring and measurement specifications, and establish the construction status grade and construction risk status evaluation criteria of each risk assessment indicator, as shown in the following table:
[0036]
[0037] (3) Descriptive scoring: According to the "Code ...
Embodiment 2
[0045] The dynamic risk assessment method for tunnel construction based on monitoring and measurement involved in this embodiment identifies the risk factors of the ZK5+310-ZK5+495 bid section on the left line of the Zuomashan Mountain Highway Tunnel, and determines the dynamic risk assessment of the Zhuomashan Mountain Highway Tunnel The index system, as shown in the table in step (1), from April 1st to April 7th, 2019, collected data on the dynamic risk assessment indicators of Zhuomashan Mountain Highway Tunnel every day, and continuously monitored and measured for one week. Through the monitoring and measurement data, we can better analyze the change law of each evaluation index, understand the stability of the surrounding rock and the support structure, and use the linear regression analysis for the monitoring and measurement displacement according to the regression analysis method, and use the moving average for the monitoring and measurement stress Regression analysis, r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com