Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Intelligent construction site OA project management system

A project management system and construction site technology, applied in the field of smart construction site OA project management system and management system, can solve problems such as low efficiency of construction site management, and achieve the effect of danger, self-rescue, and reduction of investment in monitoring.

Pending Publication Date: 2019-09-27
NANJING HEZIZ INFORMATION TECH
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The main purpose of the present invention is to provide a smart construction site OA project management system in order to solve the problem of low construction site management efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent construction site OA project management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0022] Such as figure 1 As shown, the smart construction site OA project management system provided in this embodiment includes: an information collection unit 1 for collecting the safety information of workers on the entire construction site, an information processing unit 3 for processing information from the information collection unit 1, and an information collection unit 3 for information collection. The unit 1 and the information processing unit 3 provide the OA collaboration platform 2 of the communication platform, the input of the OA collaboration platform 2 is connected to the information collection unit 1, and the output of the OA collaboration platform 2 is connected to the information processing unit 3, and the information collection unit 1 includes: A camera 11 for photographing people and things on a smart construction site, an access gate 12 for checking the information of personnel entering and leaving the construction site, an emergency call device 13 for self...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an intelligent construction site OA project management system, and belongs to the building technical field,. The intelligent construction site OA project management system includes: an information acquisition unit which is used for acquiring operation safety information of workers on the whole construction site; an information processing unit which is used for processing the information of the information acquisition unit; an OA cooperation platform which is used for providing a communication platform for the information acquisition unit and the information processing unit. The input end of the OA cooperation platform is connected with the information acquisition unit, and the output end of the OA cooperation platform is connected with the information processing unit. The detection equipment and the starting equipment are combined together through the OA cooperation platform, office automation can be rapidly achieved, manual investment supervision is reduced, and when a danger occurs on a construction site, the alarm can give an alarm, so that people are away from the danger; and meanwhile, workers can conveniently generate danger during independent operation, and self-rescue is facilitated.

Description

technical field [0001] The invention relates to a management system, in particular to an intelligent construction site OA project management system, belonging to the technical field of construction. Background technique [0002] OA, the full name of office automation, is a new type of office that combines modern office and computer technology. The core applications of OA software are: process approval, collaborative work, document management, communication tools, document management, information center, electronic forum , plan management, project management, task management, meeting management, related personnel, system integration, portal customization, address book, work notes, questionnaires, common tools. Smart construction site refers to the use of information technology to carry out precise design and construction simulation of engineering projects through a three-dimensional design platform, and to establish an interconnected, collaborative, intelligent production, an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04N7/18G08B21/02G06Q50/08G06K9/00G06F16/903
CPCH04N7/18G08B21/02G06F16/90335G06Q50/08G06V20/52
Inventor 黄景
Owner NANJING HEZIZ INFORMATION TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products