A construction method and supervision technology, which is applied in the template construction method and system field of project supervision, can solve the problems of long construction period, reduce the supervision efficiency of supervisors, and large construction site area, and achieve the effect of improving efficiency

Active Publication Date: 2019-10-18
广东至衡工程管理有限公司
View PDF7 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Existing project supervision is usually dispatched by the supervisory unit to the construction site for supervision, but due to the long construction period of the project, and the construction site usually occupies a relatively large area, it will reduce the efficiency of the supervisor's supervision, so there is an improvement space

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Template establishing method and system for engineering supervision
  • Template establishing method and system for engineering supervision
  • Template establishing method and system for engineering supervision

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0046] In one embodiment, as figure 1 As shown, the invention discloses a template establishment method for engineering supervision, which specifically includes the following steps:

[0047] S10: Obtain historical construction scheme data, and extract a construction process identifier from the historical construction scheme data.

[0048] In this embodiment, historical construction scheme data refers to all construction scheme data applied to project supervision in the past period of time, such as half a year, one year or three years. It is understandable that the construction plan in the historical construction plan data is the reference basis for the supervisors. Based on the construction plan, the supervisors go to the construction site to carry out supervision work. During the supervision work, the supervisors compare the actual construction situation with the construction plan , if an exception occurs, take corresponding measures according to the exception. The construc...

Embodiment 2

[0086] In one embodiment, a template creation system for engineering supervision is provided, and the template creation system for engineering supervision corresponds one-to-one to the template creation method for engineering supervision in the above-mentioned embodiments. Such as Figure 6 As shown, the template creation system for project supervision includes a logo acquisition module 10 , a framework table creation module 20 , a placeholder calculation module 30 and a read-write module 40 . The detailed description of each functional module is as follows:

[0087] The identification acquisition module 10 is used to obtain the historical construction scheme data, and extract the construction process identification from the historical construction scheme data;

[0088] The framework table building module 20 is used to set up a data table, write the construction process identification into the data table, and obtain the supervision framework table;

[0089] The placeholder c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of engineering supervision, in particular to a template establishing method and system for engineering supervision. The template establishing method comprises the steps: S10, obtaining historical construction scheme data, and extracting a construction flow identification from the historical construction scheme data; S20, establishing a data table, and writing the construction process identifier into the data table to obtain a supervision framework table; S30, calculating a placeholder of each construction process identifier in the supervision framework table; and S40, after each construction process identifier in the supervision framework table is written into a to-be-acquired time interface, taking the supervision framework table as an engineering supervision template. The template establishing has the effect of improving the supervision efficiency.

Description

technical field [0001] The invention relates to the technical field of engineering supervision, in particular to a template establishment method and system for engineering supervision. Background technique [0002] Project supervision refers to the supervision unit with relevant qualifications entrusted by Party A to represent Party A to Party B's project in accordance with the project construction documents approved by the state, laws and regulations related to project construction, project construction supervision contracts and other project construction contracts. It is a professional service activity of construction and implementation monitoring. Project supervision is a paid engineering consulting service; it is entrusted by Party A; the main basis for supervision is laws, regulations, technical standards, relevant contracts and documents; the criteria for supervision are law-abiding, honest, fair and scientific; the purpose of supervision It is to ensure the quality a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/24G06F17/27G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08G06F40/205G06F40/186
Inventor 范学清张汝翊李国明黄厚华戴文强曾宪威张泽钦谢福根符皓翔
Owner 广东至衡工程管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products