Optimized installation and construction method for channel under anti-electrostatic floor of subway
An anti-static floor and construction method technology, which is applied in local raised floors, electrical digital data processing, special data processing applications, etc., can solve problems such as pipeline arrangement difficulties, improve the arrangement difficulties, and ensure construction quality and technology. , The effect of improving construction quality and progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] This embodiment provides a construction method for optimized installation of a tunnel under the anti-static floor of a subway, which includes the following steps.
[0046] Step 1: BIM modeling and collision
[0047] Through the owner and the design coordination meeting, collect the plane pipeline layout drawings of the computer room signed and stamped by various professions, complete the computer room and anti-static floor building model through BIM technology and architectural drawings, and perform collision detection on the computer room model and the anti-static floor model. The problem is analyzed, and the pipeline layout under the anti-static floor of the computer room is displayed through visualization technology through the above steps.
[0048] Step two, optimization plan selection
[0049] Measure on-site with instruments and optimize the anti-static floor and pipeline arrangement based on the results of BIM collision detection. According to the test results, the anti-...
Embodiment 2
[0070] There are a total of 21 core computer rooms in the 3 stations of the Electromechanical II Section of the West Extension Project of Beijing Metro Line 6. During the construction of the anti-static floor and channel of the 21 core computer rooms, the optimization of the installation and construction method of the channel under the subway anti-static floor is applied. The arrangement of channels under the anti-static floor improves construction efficiency and space utilization. At the same time, material loss is greatly reduced, on-site cutting operations are avoided, and environmental pollution at the construction site is reduced. The benefit comparison is shown in the table below.
[0071]
[0072] Compared with the above table, it can be seen that the optimized installation and construction method of the tunnel under the anti-static floor of the subway reduces the material loss by 5% compared with the traditional installation method. It has less on-site processing and high ...