technical field
[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a tunnel construction method for upper soft and lower hard strata. Background technique
[0002] The mining method (also known as the shallow burial method) refers to the construction method of building tunnels by excavating underground tunnels. A construction method for excavating sections to build tunnels and underground works. The shield method is a fully mechanized construction method in the construction of the underground excavation method. It pushes the shield machine in the ground, and supports the surrounding rocks through the shield shell and segment to prevent the collapse into the tunnel; In front of the excavation front, a cutting device is used to excavate the soil, which is transported out of the hole by an excavation machine, and is pushed in by a jack at the rear, and prefabricated concrete segments are assembled to form a mechanized const...