Multi-stage power supply planning method for maximizing renewable energy utilization

A renewable energy and power planning technology, applied in resources, data processing applications, forecasting, etc., can solve problems such as the reduction of renewable energy consumption

Active Publication Date: 2020-03-24
XI AN JIAOTONG UNIV
View PDF3 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In fact, in power systems with high penetration of renewable energy, such a cost-oriented approach to power planning can lead to a substantial reduction in the uptake of renewable energy

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-stage power supply planning method for maximizing renewable energy utilization
  • Multi-stage power supply planning method for maximizing renewable energy utilization
  • Multi-stage power supply planning method for maximizing renewable energy utilization

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0090] The present invention provides a multi-stage power planning method for maximizing the utilization of renewable energy. Aiming at the separation of investment decision-making / operation evaluation modules in traditional power planning methods and the problem of only being economically oriented, the investment decision-making module and the operation evaluation module are combined. Together, it makes the modeling of the power planning problem more refined, and can provide more economical and reliable power planning. In addition, the present invention fully considers the short-term operation uncertainty caused by the load and renewable energy power generation, and proposes a new objective function to satisfy the utilization of renewable annual energy within the planning period to the greatest extent.

[0091] see figure 1 , the present invention is a multi-stage power supply planning method for maximizing the utilization of renewable energy, which is used to guide the conti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a multi-stage power supply planning method for maximizing renewable energy utilization. The method includes: acquiring power supply planning data, system basic technical data,system operation constraint condition data and system operation prediction data; constructing a multi-stage power supply planning model, a power supply planning budget and construction limitation constraint, a system operation basic constraint, a thermal power plant operation constraint, a hydraulic power plant operation constraint, a renewable energy power plant operation constraint, a delivery channel operation constraint and a renewable energy power plant investment portfolio constraint by taking the maximum renewable energy utilization amount as an objective function; and inputting the obtained data into the constructed power supply planning model, performing solving to obtain a power supply planning construction scheme and a renewable energy consumption evaluation result, and carryingout multi-stage power supply planning to realize maximum utilization of renewable energy. According to the method, the defects in a traditional power supply planning method are overcome, the multi-aspect requirements of system operation can be better met, the utilization level of renewable energy sources is greatly improved, and the method has stronger guiding significance for actual constructionof multiple types of power supplies.

Description

technical field [0001] The invention belongs to the technical field of power supply planning, and in particular relates to a multi-stage power supply planning method for maximizing the utilization of renewable energy. Background technique [0002] The random fluctuation of renewable energy power generation has brought huge challenges to the operation and scheduling of the power system. In order to ensure the safe operation of the system and ensure the full consumption of a high proportion of renewable energy, it is necessary to fully Considering the fluctuation and intermittency of renewable energy output, the resulting power planning scheme has sufficient adjustment flexibility. Therefore, there is a need for a multi-stage power planning method that maximizes the utilization of renewable energy, and optimizes the power structure at the planning level to achieve full utilization and accommodation of renewable energy in the system. [0003] In recent decades, related researc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/06375G06Q50/06Y02P90/82Y04S10/50
Inventor 王建学李清涛古宸嘉张耀鲍国俊刘树桦
Owner XI AN JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products