Construction method of pile breaking head of cast-in-place pile, auxiliary isolation net and preparation method of auxiliary isolation net
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA FIRST METALLURGICAL GROUP
- Publication Date
- 2020-07-10
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention belongs to the field of construction and relates to a construction method of a cast-in-place pile, in particular to a construction method of a broken pile head of a cast-in-place pile, an auxiliary isolation net and a preparation method of the auxiliary isolation net. Background technique
[0002] With the development of society, the construction industry has also ushered in huge changes. Various modern demands have made the construction technology requirements of the construction industry more and more strict. In the part of foundation construction, the construction of cast-in-place piles also faces huge challenges. Changes, large diameter and high quality have become a rigid requirement; for the construction of large diameter cast-in-place piles, since the quality of the top surface concrete cannot meet the requirements after solidification, in order to ensure the quality of the concrete pile body, it must be poured beyond the pouring pr...