Steel plate pile and earth dam combined cofferdam and cofferdam construction method
A technology of combining cofferdams and steel sheet piles, applied in sheet pile walls, infrastructure engineering, construction, etc., can solve problems such as thin river bed covering, and achieve the effects of improving impermeability, waterproofing, and increasing cofferdam gravity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Please refer to Figure 1 to Figure 4 , Figure 1 to Figure 4 Provided is a combined cofferdam of a steel sheet pile and an earth dam.
[0041] The object of the present invention is to provide a combined cofferdam of steel sheet piles and earth dams, which can limit the slope of the earth dam cofferdam and the width of the occupied river, control the scope of cofferdam construction work, improve the water resistance and anti-seepage capabilities of the cofferdam, and the cofferdam The overall stability is strong. It is suitable for shoals where the construction scope is limited, the riverbed cover is thin, and the steel sheet piles cannot be driven into the riverbed to form sufficient anchorage depth, the water depth is 3-5m, and the flow velocity is 1-3m / s.
[0042] Embodiments of the invention are achieved through the following technical solutions:
[0043] Please refer to Figure 1 to Figure 3 , a combined cofferdam of steel sheet piles and earth dams, comprisin...
Embodiment 2
[0058] Please refer to Figure 5 , the present embodiment provides a 500 cofferdam construction method of a gently inclined bedrock river bed with less overlying soil layer, which can include the following steps:
[0059] a. Determine the scope of the island construction, and fill the dregs on the shore side to form a passage to the island. The outer edge of the island surface is wider than the position of the inner steel sheet pile 100 and the island surface is higher than the construction water surface;
[0060] b. The rotary drilling rig equipment enters the site and constructs the positioning piles of the outer steel sheet pile 200. After the hole is formed, concrete is poured to the island surface, and the pre-embedded steel is used as the positioning and reinforcement pile of the outer steel sheet pile 200 cofferdam;
[0061] c. The rotary drilling rig is removed from the site, and the piling machine goes to the island to insert and drive 200 outer layer steel sheet pile...
PUM
Property | Measurement | Unit |
---|---|---|
Wall thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com