An Invasive Weed Algorithm for Solving Resource Constrained Project Scheduling
A resource-constrained and weedy technology, applied in the field of construction project scheduling, can solve problems such as low algorithm efficiency, achieve obvious optimization effects, simple and easy algorithms, and improve solution efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] Using the calculation examples in the standard calculation example library PSPLIB, 5 sets of initial input data are randomly selected under the four working conditions of 30, 60, 90, and 120 activities. The projects in the example library involve four kinds of renewable resources. Each activity has a certain demand for one or more resources per unit time, and each resource has a maximum supply per unit time.
[0046] The specific implementation plan is as follows:
[0047] 1. Determine the description and assumptions of the resource-constrained project scheduling problem, and establish a mathematical model for the optimization of resource-constrained project scheduling objectives
[0048] The resource-constrained project scheduling problem studies the scheduling problem of how to optimize some management objectives in the case of resource-constrained projects with many sequence-constrained activities. The specific description is as follows:
[0049] First, assume that ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com