Cofferdam structure and construction method thereof
A construction method and cofferdam technology, which can be applied in infrastructure engineering, construction, etc., can solve the problems of uneven accumulation of interception materials and leakage of cofferdams, and achieve simple demolition construction steps, improve sealing, and improve anti-seepage performance. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] The embodiment of the present application discloses a cofferdam structure.
[0053] A cofferdam structure, comprising a fixed pier 1 and a detachable cofferdam board 2; the fixed pier 1 is fixedly built on the inner side of the river bank; at least one end of the detachable cofferdam board 2 is fixedly installed on the fixed pier 1; the detachable cofferdam board 2 It includes at least two water-retaining pile plates 21, one end of the water-retaining pile plate 21 is provided with a card part 211 protruding outward, and the other end surface is provided with a card groove 212 matching the card part 211; one side of the card part 211 The wall is provided with a first groove 213, and the side of the card groove 212 near the first groove 213 is provided with a second groove 214 corresponding to the first groove 213, and the axes of the first groove 213 and the second groove 214 The axial direction is the same as that of the card slot 212; the adjacent water retaining pile...
Embodiment 2
[0085] The difference between this embodiment and Embodiment 1 is that a cofferdam structure is used in the repair and construction process of the river slope, so the cofferdam structure is arranged along the flow direction of the river. The structure of the fixed pier 1 is the same as that of the first embodiment.
[0086] refer to Figure 7 , the embodiment of the present application discloses a cofferdam structure, including a fixed pier 1 and a detachable cofferdam board 2 . There are two fixed piers 1, which are fixed on the same side of the river slope to be repaired, and are respectively located upstream and downstream of the river slope to be repaired. The detachable cofferdam board 2 includes at least two water retaining pile boards 21 . One end of the detachable cofferdam board 2 is fixedly installed on the fixed pier 1 located upstream, and the other end extends along the water flow direction, is arranged in a curved arc, and is then fixedly connected to the downs...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com