Multi-energy short-term optimization scheduling method

An optimized scheduling and multi-energy technology, applied in the direction of AC network circuits, electrical components, circuit devices, etc., can solve the problem of not considering the influence of system capacity redundancy due to system peak regulation constraints, so as to avoid redundancy and guarantee of start-up capacity Stability, effect of ensuring adequacy

Pending Publication Date: 2022-01-14
STATE GRID GASU ELECTRIC POWER RES INST +1
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the above literature only considers improving the reliability of system operation in a single scheduling cycle, and does not consider the peak-shaving constraints of the continuous scheduling cycle of the system and the impact of system capacity redundancy.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-energy short-term optimization scheduling method
  • Multi-energy short-term optimization scheduling method
  • Multi-energy short-term optimization scheduling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0101] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0102] see Figure 1-6 As shown in Table 1-3, a multi-energy short-term optimal scheduling method includes the following steps:

[0103] Step 1: Firstly, aim at the minimum energy consumption of system operation, and establish a multi-source coordinated short-term optimal scheduling model considering the constraints of system operation within the scheduling period. The constraints correspond to formulas (2) to (18) listed below, and at the same time Evaluate ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-energy short-term optimization scheduling method. The method comprises the following steps of 1, firstly, establishing a multi-source coordination short-term optimization scheduling model by taking minimum system operation energy consumption as a target and considering system operation constraint conditions in a scheduling period, and meanwhile, evaluating a unit combination condition and judging whether a system capacity is redundant or not; and 2, if the system capacity is redundant, adding a maximum starting unit number constraint of thermal power generating units, and performing simulation calculation on four aspects of a unit combination scheme, an energy power generation power condition, system energy loss and a thermal power generating unit output standard deviation. The method has the beneficial effects that in the multi-source coordination scheduling system, the randomness that the peak regulation constraint of the continuous scheduling period can adapt to new energy output is considered, and the peak regulation adequacy of the system is ensured; and according to the method, the maximum starting unit number constraint is introduced into the optimization scheduling model, frequent conversion of the unit operation state can be reduced, and redundancy of the starting capacity is avoided.

Description

technical field [0001] The invention relates to an optimal scheduling method, in particular to a multi-energy short-term optimal scheduling method, and belongs to the technical field of energy scheduling. Background technique [0002] In recent years, the proportion of new energy power generation in the power system has been continuously increasing. The vigorous development of clean energy has brought positive impacts on the economic operation of the system and alleviated the problem of energy shortage. The stable operation of the economy has brought great challenges. Therefore, it is of great significance to study the multi-energy optimal dispatching model considering peak-shaving constraints from the perspective of short-term dispatching to reduce the peak-shaving pressure of the system. [0003] Existing multi-energy optimal scheduling research mainly focuses on the consideration of system economic operation. Some literature studies have studied the scheduling problem of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/46
CPCH02J3/466H02J2203/20
Inventor 张柏林吴悦邵冲刘丽娟王定美刘克权魏博徐宏雷余姣刘春汤文张烜榕周强李津张金平吕清泉高鹏飞张彦琪张健美张珍珍张睿骁
Owner STATE GRID GASU ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products