Construction method for widening and filling solidified soil for highway interchange ramp roadbed

A technology of expressway and construction method, which is applied in the field of civil construction, can solve the problems of low filling efficiency of roadbed, inability to evenness, and effective treatment of single-layer filling with compaction degree, so as to improve filling efficiency and ensure overall quality Effect

Active Publication Date: 2022-03-29
湖南长株高速公路开发有限责任公司
View PDF16 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] For this reason, the present invention provides a construction method for widening and filling solidified soil on highway interchange ramp roadbed, which is used to overcome the problems caused by the inability to effectively process single-layer fill soil whose flatness and compaction degree do not meet the standards in the prior art. Aiming at the problem of low filling efficiency of roadbed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for widening and filling solidified soil for highway interchange ramp roadbed

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] In order to make the objects and advantages of the present invention clearer, the present invention will be further described below in conjunction with the examples; it should be understood that the specific examples described here are only for explaining the present invention, and are not intended to limit the present invention.

[0059] Preferred embodiments of the present invention are described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principle of the present invention, and are not intended to limit the protection scope of the present invention.

[0060] see figure 1 As shown, it is a flow chart of the construction method for widening and filling the solidified soil of the expressway interchange ramp subgrade of the present invention. The construction method for widening and filling solidified soil of expressway interchange ramp subgrade described in t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of civil construction, in particular to an expressway interchange ramp roadbed widening and solidified soil filling construction method which comprises the steps that the soil feeding range of a roadbed of each area is determined; using solidified soil to loosely lay the roadbed in each area; a bulldozer is used for sequentially flattening the subgrade of each area, and a land leveler is used for sequentially leveling the subgrade of each area; the roadbed in a single area is rolled, and whether the roadbed meets the standard or not is judged after rolling; the roadbed meeting the standard is subjected to watering maintenance, and solidified soil is added layer by layer after maintenance is completed; and renovating the surface of the roadbed and the slope. After rolling of the single-layer roadbed is completed, whether the flatness or compactness of the roadbed meets the standard or not is judged according to the thickness change amount of the roadbed, corresponding operation is used according to the judgment result so that the rolled single layer can meet the standard, and the filling efficiency of the roadbed is effectively improved.

Description

technical field [0001] The invention relates to the technical field of civil engineering construction, in particular to a construction method for widening and filling solidified soil on an expressway interchange ramp roadbed. Background technique [0002] The traffic volume of expressways is increasing year by year. Due to the underestimation of the rapid growth of traffic in the early construction of expressways, some expressway intercommunications have experienced traffic saturation, which reduces the efficiency of expressway intercommunication. Compared with newly built roads, the widening and reconstruction of old roads, especially the widening and reconstruction of interchange ramps, is difficult to construct, with complex processes and high quality requirements. Due to the different foundation settlements of the new and old subgrades, their settlement deformations are also different, resulting in differential settlement between the old and new subgrades. [0003] The ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01C21/00E01C19/28
CPCE01C21/00E01C19/28
Inventor 李刚谭卓民郭艳玲朱云雄刘泽辉
Owner 湖南长株高速公路开发有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products