A construction method and anchor pipe technology, which can be used in infrastructure engineering, excavation, sheet pile walls, etc., can solve problems affecting the safety of buildings, etc., and achieve the effects of preventing rain erosion damage, enhancing overall rigidity, and constraining displacement.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] In conjunction with the accompanying drawings, a description is made of the framework anchor pipe injection support of the present invention:
[0034] Depend on figure 1 It can be seen that the injection support of the anchor pipe of the frame is structured as follows:
[0035] Within a certain width of the ground around the foundation pit, a plurality of rows of regularly distributed vertical anchor pipes 1 are arranged, the length of the vertical anchor pipes exceeds the depth of the foundation pit, and the rear end of the vertical anchor pipes is exposed to the ground to install a prefabricated frame 2;
[0036] With the excavation of the foundation pit, the horizontal anchor pipe 3 is driven into the pit wall, the length of the horizontal anchor pipe is limited to the outermost row of vertical anchor pipes passing through the pit edge, and the quincunx shape is evenly distributed between the vertical anchor pipe column spacing;
[0037] Near the junction of the bot...
Embodiment 2
[0041] The foundation pit on the soft ground is 8 meters deep, the length of the vertical anchor pipe is 11 meters, the diameter of the small diameter anchor pipe is 60 mm; the length of the horizontal anchor pipe is 4 meters, the distance is 80 cm, and the diameter of the small diameter anchor pipe is 48 mm. mm. The construction sequence of the injection support construction method of the frame anchor pipe is as follows:
[0042] (1) According to the design plan, on the ground around the foundation pit, carry out on-site setting-out positioning for the series of vertical anchor pipes, with a distance of 1 meter and a total of 4 rows;
[0043] (2) Pneumatic impact hammer or manual impact hammer can be used to drive into multiple rows of regularly distributed vertical anchor pipes;
[0044] (3) Install the prefabricated frame, the steel pipe rods of the prefabricated frame and the pipe end connection members are connected by bolts, and the ends of the vertical anchor pipes are...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com