Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

242 results about "Quincunx" patented technology

A quincunx /ˈkwɪn.kʌŋks/ is a geometric pattern consisting of five points arranged in a cross, with four of them forming a square or rectangle and a fifth at its center. It forms the arrangement of five units in the pattern corresponding to the five-spot on six-sided dice, playing cards, and dominoes. It is represented in Unicode as U+2059 ⁙ FIVE DOT PUNCTUATION or (for the die pattern) U+2684 ⚄ DIE FACE-5.

Deep-hole and shallow-hole combined bench blasting method capable of reducing blasting boulder rate

InactiveCN102506623AAvoid uniformityAvoid problems that are mainly concentrated in the bottom of the blast zoneBlastingQuincunxDeep hole
The invention relates to a deep-hole and shallow-hole combined bench blasting method capable of reducing blasting boulder rate. The method comprises the following steps of: 1) drilling boreholes on the bench of a blasting area through a triangular or quincunx-shaped hole arrangement method according to open deep-hole bench blasting design and requirements to obtain deep holes; 2) drilling a shallow borehole with hole diameter being less than or equal to 50mm in the middle between every two deep holes in the same row to obtain shallow holes; 3) respectively charging the deep holes and the shallow holes, laying initiating explosive cartridges and blocking the mouths of the deep holes and the shallow holes; and 4) conducting row-to-row sequential short-delay initiation according to initiation sequence in design requirements and blasting in one step. The deep-hole and shallow-hole combined bench blasting method capable of reducing blasting boulder rate has the advantages that the problem of high boulder rate of blocked sections in a deep-hole bench blasting method is solved, the blasting effect is improved, the subsequent excavating and loading efficiency is improved, the engineering progress is accelerated and the engineering cost is reduced.
Owner:LANZHOU UNIVERSITY

Outboard template construction method of post-pouring belt of outer wall of underground structure

InactiveCN101696580ATime saving lashingBinding at willArtificial islandsCeramic shaping apparatusQuincunxRebar
The invention relates to a building construction method, in particular to an outboard template construction method of a post-pouring belt of an outer wall of an underground structure, which comprises the following steps of: freely taking steel bar wastes produced in a construction site, binding a precast slab reinforcement cage in a single-row two-way binding way, wherein the width is more than that of the post-pouring belt and the length is 1 or 1.2 m; after the reinforcement cage is bound, binding a fixed precast slab steel wire at the intersection of transverse and longitudinal steel bars, wherein the extension length of the steel wire is 400-500 m and the binding position of the steel wire is arranged in a quincunx way; using a 5*10 mm or 10*10 mm wood beam as a precast slab template; after the reinforcement cage is bound and formed and the template is supported, pouring precast slabs when residue concrete is provided on site, wherein the thickness is 50 mm; and when an excessive trough is backfilled, binding the precast slabs on the steel bar of the post pouring belt by using a preserved steel wire, and stacking the precast slabs on the vertical surface of the outer wall one by one. The invention is convenient and simple, saves time and labor, and enables the steel bars and the concrete to be fully utilized, thereby reducing the waste and saving the cost.
Owner:MCC JINGTANG CONSTR +1

Reinforcement method for transmission tower shallow base foundation under composite soft soil foundation

The invention relates to a reinforcement method for a transmission tower shallow base foundation under a composite soft soil foundation. A cement-soil mixing pile composite base is adopted for reinforcement, and the foundation reinforcement method comprises the following steps: (1) pile positions are distributed on the soft soil foundation in the form of square or quincunx distribution mode, and the pile diameter, pile length and pile spacing are determined; (2) pile holes are drilled in the base foundation, cement slurry is injected into the pile holes to form cement piles, and anchor bars are arranged in the cement piles within 2 hours after the cement piles are finished; (3) a mattress cushion layer is paved on the treated foundation, and the anchor bars extend out of the mattress cushion layer; (4) a flexible platy foundation is mounted on the mattress cushion layer, the anchor bars in the cement piles are welded with the main bars of the flexible platy foundation, and the flexible platy foundation is used as a bearing layer. Compared with the flexible platy foundation reinforcement or bored pile reinforcement, the reinforcement method not only can meet the design requirements, extend the application range of shallow foundation, but also can reduce the total cost and have remarkable economic benefits.
Owner:STATE GRID CORP OF CHINA +2

Large-span pipe truss hoisting method

The invention relates to the technical field of floor system and roof system construction of large-span architectural engineering, in particular to a large-span pipe truss hoisting method. The large-span pipe truss hoisting method comprises the following steps that step one, measurement and re-examination are carried out; step two, arc-shaped steel column segment and circumferential truss hoistingis carried out; step three, temporary operation platform installation is carried out; step four, main truss bed-jig assembly is carried out; step five, main truss hoisting is carried out, and specifically, a quincunx integral hoisting method is adopted in super-long plane main truss horizontal segment steel beam hoisting; and step six, end portion arc-shaped segment secondary truss and truss hoisting is carried out. A loading feature of higher rigidity of element itself in a plane is fully used, installation errors and accumulative errors generated during truss segment installation of the large-span prestress tool orthogonal plane pipe truss system can be effectively solved, construction technology of a quincunx integral hoisting super-long tool orthogonal plane pipe truss is adopted, andthe problems that the rigidity is higher but out-of-plane rigidity is relatively weak, and element overall deformation is nonuniform in the hoisting processing of a plane truss are solved.
Owner:CHINA CONSTR SEVENTH ENG BUREAU THE SECOND CO LTD

Optimization and recombination method for well network of in-situ leaching uranium mining

ActiveCN106930747AImprove leaching rateSolve the problem of low resource leaching rateFluid removalQuincunxHydrology
The invention provides an optimization and recombination method for a well network of in-situ leaching uranium mining. The method comprises the steps that when the uranium concentration of leachate of a certain leaching mining units of a well site mining area is 3-10 mg/L, or the leaching rate reaches 60%-75%, the positions of liquid extracting wells and liquid injecting wells are adjusted; the injecting wells at the boundary of the mining area are not adjusted to be extracting wells, and it is guaranteed that wells on the periphery of the mining area are all the injecting wells; when a well type is a quincunx type, the adjacent extracting wells are connected into straight lines, the adjacent injecting wells are connected into straight lines, the original extracting wells are changed into injecting wells, the original injecting wells are changed into extracting wells, and it is guaranteed that the well type after adjusting is still the quincunx type; and when the well type is a seven-point type, the extracting wells are connected into lines, the two injecting wells are located between every two extracting wells, translation is conducted in the same direction of the straight lines, after translation, the original extraction wells are changed into injecting wells, the adjacent injecting wells along the straight lines are changed into extracting wells, and it is guaranteed that the well type after adjusting is still the seven-point type. The optimization and recombination method is a secondary stoping method improving the leaching rate of the uranium resource and solves the problem that through a fixed well type, leaching dead angels exist at the time of leaching, so that the resource leaching rate is low.
Owner:BEIJING RESEARCH INSTITUTE OF CHEMICAL ENGINEERING AND METALLURGY +1

Firm structure for preventing and controlling freeze-thaw collapse of side slope in cold region and construction method for firm structure

The invention discloses a firm structure for preventing and controlling freeze-thaw collapse of a side slope in a cold region and a construction method for the firm structure. An arch framework is paved on the surface of the side slope; a slope toe wall is arranged at the bottom of the side slope; a plurality of drain pipes are arranged in each arch ring of the arch framework in a rectangular array or quincunx array mode; a plurality of drain holes are formed in each drain pipe; the outer wall of each drain pipe and the end of each drain pipe, which stretches into a soil body of the side slope, are coated with dense gauze; and a heat preservation structure is arranged on the bottom surface and the side wall of the slope toe wall and the surface of the side slope at certain depth. Groundwater can be effectively drained, groundwater level, the water content of the side slope and water migration rate are reduced, the stability of the side slope is ensured, and engineering cost is greatly reduced; through the heat preservation structure, the freezing depth and frost heaving thaw collapse amount of the side slope can be effectively reduced, and the engineering cost can be effectively reduced; and through the arch framework, the infiltration of surface water, and the scouring of the surface of the side slope due to melted snow, rain and the like are reduced, so that the width, depth and length of a lower layer crack are reduced, and the surface of the side slope is protected.
Owner:CHINA CONSTR SIXTH ENG DIV CORP

Method for treating soil pollution in a hierarchically cyclic cleaning manner

The invention discloses a method for treating the soil pollution in a hierarchically cyclic cleaning manner. According to the method, water seepage/water collection pipe networks are hierarchically arranged on the earth surface and under the earth and work together with a water injection system and a sewage treatment system, which are arranged on the ground, to clean polluted soil hierarchically and sequentially from top to bottom until all of the soil with the pipe networks are completely cleaned to reach the ruled standard. If the deep soil layer 5 meters under the ground still has pollutants required to be cleaned away, a quincunx-shaped silo can be used for extracting the polluted water, and the lowermost layer of water seepage/water collection pipe network is used for filling clean water. The depth of the silo is set according to a demand that the silo reaches a non-permeable layer. Separated heavy metals and pollutants can be recycled and treated into harmless resources. According to the method, the shortcomings of the conventional treatment method are fundamentally overcome; furthermore, equipment is small in investment and high in cleaning efficiency and can thoroughly clean the pollutants; and the method is extremely good in popularization and application prospect.
Owner:东营金川水土环境工程有限公司

Method for reinforcing round-section pier by using polyurethane concrete materials and thin-wall steel sleeves

The invention relates to a method for reinforcing a round-section pier, in particular to the method for reinforcing the round-section pier by using polyurethane concrete materials and thin-wall steel sleeves. The method needs to solve the problem that in an existing frequently-used bridge reinforcing technique, the interface strength is insufficient, internal damage gaps can not be densely packed, the construction is tedious, the construction period is long, and the tensile strength and compressive strength of a component can not be improved at the same time. The method includes the following steps that a mortar layer on the surface of concrete on a concrete pier reinforcing part is chiseled away, and cleaning and drying are then conducted; connecting rebars are implanted in the concrete pier reinforcing part, and then welding shear nails are arranged according to the quincunx in semicircular thin-wall steel sleeves; every two of the semicircular thin-wall steel sleeves with the welding shear nails are oppositely welded to form the thin-wall steel sleeves on the surface of the concrete pier reinforcing part, the polyurethane concrete materials are prepared and poured in the thin-wall steel sleeves, and curing is conducted under natural conditions. The method is used for reinforcing the round-section pier by using the polyurethane concrete materials and the thin-wall steel sleeves.
Owner:NORTHEAST FORESTRY UNIVERSITY

Foldable-type tent

The invention discloses a foldable-type tent, which is characterized in that: supporting rods can be adequately unfolded to resist the influence of an external force, the foldable-type tent is easy to set and to fold and consists of a bracket and a tent cloth, wherein the bracket comprises a main hinge and a plurality of supporting rods, the main hinge consists of an upper cap, a compression spring, a quincunx wheel, a lower cap, a main force arm and a push rod, the upper cap is connected with the lower cap, the quincunx wheel is arranged inside an inner cavity which is formed by the upper cap and the lower cap, one end of the compression spring is connected to the upper cap, the other end of the compression spring is connected with the quincunx wheel, the middle part of the lower cap is provided with a through hole, a slide shaft is arranged below the quincunx wheel to pass through the through hole, a clamping groove is arranged at the side of the through hole, the quincunx wheel is provided with a clamping block, one end of a lever device is attached to the slide shaft and is arranged below the clamping block, the other end of the lever device is a pressing end, a pivot is embedded inside the clamping groove, one end of the main force arm is connected with the supporting rods, the other end of the main force arm is hinged with the edge of the upper cap, one end of the push rod is hinged with the quincunx wheel, and the other end of the push rod is hinged with the main force arm.
Owner:陈焕奎 +1

Method for eliminating loess foundation collapsibility through microwave heating

The invention discloses a method for eliminating loess foundation collapsibility through microwave heating. The method includes the steps that firstly, a processing area is determined, and according to collapsible loess area building standards, the plane processing range and the processing thickness of a collapsible loess foundation are determined; secondly, drilling is carried out, soil around drilled holes is heated through microwave irradiation, an engineering geological drilling rig is adopted for drilling, the depth of the drilled holes is the same as the processing thickness of the collapsible loess foundation, and the drilled holes are distributed in a quincunx shape, a rectangular shape or a cuboid shape; in the drilling process, after each drilled hole is formed, the soil around the drilled hole is heated through microwave irradiation in a segmented mode from bottom to top by means of a microwave heating device; thirdly, the drilled holes are filled with cohesive soil, and layered compacting is carried out. The method is simple in step and convenient to implement, can effectively eliminate collapsibility of the collapsible loess foundation, and is wide in application range, free of pollution, easy to control in site, high in practicality, good in use effect and convenient to use and popularize.
Owner:XIAN UNIV OF SCI & TECH

Quick dredger fill consolidation device and construction method

ActiveCN107313421AEasy to separateShorten the consolidation cycleSoil preservationAir compressionWater filter
The invention discloses a quick dredger fill consolidation device. The quick dredger fill consolidation device is composed of at least one well point pipe, a transverse drainage pipe, a transverse air compression pipe, a vacuum pump and an air compressor. The well point pipe is composed of an inner pipe and an outer pipe which are arranged in a coaxial mode. The top of the inner pipe is connected with the air compressor through the transverse air compression pipe, and the top of the outer pipe is connected with the vacuum pump through the transverse drainage pipe. The inner pipe is provided with a cross-shaped hole, and the outer pipe is provided with a quincunx small hole. One end of a small pipe is welded to the cross-shaped hole, the other end of the small pipe penetrates the small hole, and the outer wall of the other end of the small pipe is welded to the small hole in a sealing mode. The quick dredger fill consolidation device is combined with the light well point dewatering characteristics, the double-pipe structure of the well-point drainage pipe is adopted, silt, floury soil and mud soil which are in a fluidal plastic state are subjected to quick consolidation, the consolidation time is shortened to 2-3 months from one year, and the consolidation time is greatly shortened; and meanwhile, the quick dredger fill consolidation device replaces the water filtering procedure of a plastic drainage plate, resource wasting and secondary environment pollution caused by the plastic drainage plate are avoided, recycling is achieved indeed, and benefits are brought to the nation and the people.
Owner:JIANJI CONSTR GRP

Method for reinforcing railroad bed of salt lake by using saturated brine clay slurry

The invention provides a method for reinforcing a railroad bed of a salt lake by using saturated brine clay slurry, wherein a brine upward percolation channel with low degree of mineralization is filled by a grouting manner. The method specifically comprises the following steps: arranging a row of grouting holes in the shoulder of the railroad bed; respectively arranging two rows of grouting holes in positions which are 2cm away from the outsides of a slope toe and a berm, wherein the two rows of grouting holes are arranged in a staggered manner in quincunx shape, the interval between the every two grouting holes is 0.8-1.0m, and the distance between two rows is 0.5-0.6m; by taking the brine clay slurry as a grouting material, controlling the grouting pressure at 1.5-2.0MPa; grouting every other one hole; and when slurry is overflowed from the wall of a single hole, stopping grouting. According to the method provided by the invention, the brine clay slurry is adopted to grout, clay is quickly condensed in brine to fill the Karst caves of the salt lake bed, and clay is well contacted with rock salt surfaces to seal gaps of clay layers of the rock salt, so that brine with low degree of mineralization can percolate upwards so as to further reinforce the railroad bed of the salt lake, so that guarantee is provided for traffic safety of railways along the salt lake.
Owner:NORTHWEST RES INST CO LTD OF C R E C

Construction method for high and cold region tunnel hole body water resistance

The invention relates to a construction method for high and cold region tunnel hole body water resistance, and relates to a construction method applicable to high and cold region tunnel hole body water resistance. The method mainly solves the problem that the existing high and cold region tunnel hole body water resistance construction speed is low. A non-woven fabric is laid on the surface of a sprayed concrete layer of a tunnel hole body, a plurality of hot melting liners are arranged on the outer surface of the non-woven fabric, the hot melting liners and the non-woven fabric are fixed to the sprayed concrete layer through fasteners, and the hot melting liners are arranged according to the quincunx; an inner layer waterproof plate is welded to the hot melting liners on the fixed non-woven fabric through an electric hot melting device, a plurality of suspenders are manufactured through offcut of the waterproof plate, hemp ropes are pressed below the suspenders, the suspenders are welded to the inner layer waterproof plate through a welding gun, a heat preservation plate is laid on the outer surface of the inner layer waterproof plate, the hemp ropes penetrate through the heat preservation plate, the outer ends of the hemp ropes are exposed and fixedly provided with the hot melting liners, and an outer layer waterproof plate is welded to the outer surface of the heat preservation plate through the electric hot melting device. The construction method has the advantage of being high in construction speed.
Owner:CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD

Technology for planting lotus roots in fish pond

The invention discloses a technology for planting lotus roots in a fish pond. The technology includes the following steps that (1) germination accelerating is conducted, and breeding lotus roots are stacked for accelerating germination; (2) the planting density is controlled, the sowing quantity per mu is 200-250 kg, wide and narrow row spacing is used for seed arrangement, the wide row space is 2.5 m, the narrow row space is 0.4 m, the distance between plants is 0.6 m, and the number of required bud heads is 200-400; (3) planting is carried out, seed arrangement is conducted at the end of February and the beginning of March, all the plants between the rows are arranged to be in a quincunx shape, the bud heads on the periphery face inwards, the phenomenon that lotus whips are inserted into the periphery of the fish pond is avoided, the remaining rows also face one side, the bud heads are inserted in mud in the planting process, and the tips protrude out of the water surface; (4) membranes are covered; (5) the membranes are uncovered, after the first ten-day period of May, the membranes are uncovered, ridges are removed, water is poured till the depth of water is 10-15 cm, fish excrement of 2000 kg and urea of 17 kg are subjected to top dressing per mu, and foliage spraying of boric fertilizer of 2 kg is conducted per mu; (6) harvesting is performed. According to the technology, the whole planting processes such as germination accelerating, planting, membrane covering and fertilizer applying are systematically controlled, the bud ratio, the growth rate and the survival rate of the lotus roots are effectively guaranteed, the quality of the lotus roots is good, the yield of the lotus roots is high and economic benefits are good.
Owner:张昌明

Exposed frame type low-wind-resistance scales curtain wall structure and mounting method thereof

ActiveCN106088418ARealize arc installationAvoid dust and other phenomenaWallsQuincunxHeight difference
The invention provides an exposed frame type low-wind-resistance scales curtain wall structure and a mounting method thereof. The exposed frame type low-wind-resistance scales curtain wall structure comprises a curtain wall sealing repair layer, a curtain wall adornment layer, first adornment plates and second adornments, the curtain wall sealing repair layer is mounted on the outer wall of a construction structure, and the curtain wall adornment layer is mounted outside the curtain wall sealing repair layer; the curtain wall adornment layer comprises a plurality of C-shaped scales frames with unified orientation and in interlocking quincunx layout, internal slots are arranged in internal openings of the C-shaped scales frames, external slots are arranged in external openings of the C-shaped scales frames, and the internal slots and the external slots are arranged in a high and low manner; the first adornment plates are embedded in the internal slots of the C-shaped scales frames, and the second adornment plates are embedded in the external slots of the C-shaped scales frames. By the arrangement of the height difference between the first adornment plates and the second adornment plates, wind resistance can be lowered, and on the other hand, curve-turning mounting of the curved walls can be realized.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products