Method and apparatus for automatic selecting staging time
An automatic upgrade and automatic selection technology, applied in program control devices, program loading/starting, digital transmission systems, etc., can solve problems such as heavy workload, difficulty in timing automatic upgrades, and large impact on equipment processing capabilities, and reduce the impact. , the effect of reducing workload
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2009-01-14
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The present invention relates to an upgrade method and device, in particular to a method and device for automatically selecting the upgrade time according to the load, which belongs to the field of data communication and security. Background technique
[0002] In the field of data communication and information security, many new viruses and attack methods are produced or discovered every day. These viruses or attack methods generally have certain characteristics, which can be detected according to certain characteristics in behavioral characteristics and content. Whether it is some kind of attack or not, and whether it carries some kind of virus, the file storing such characteristics is usually called a characteristic knowledge base. In the application identification technology, attack prevention technology and virus detection technology, the feature recognition of the detected object is generally carried out according to the feature knowledge base, so...
Examples
Embodiment Construction
[0022] figure 1 A flow chart of an embodiment of the method for automatically selecting an upgrade time in the present invention. Such as figure 1 As shown, this method includes:
[0023] Collect and save the load information of the equipment;
[0024] Select the upgrade time period according to the saved load information;
[0025] When the upgrade time period is reached, the device is started to perform an automatic upgrade operation.
[0026] In this method, the load information of the device may also be collected at the same time when the operation of the upgrade time period is selected according to the saved load information; when the device is automatically upgraded, the load information of the device may be collected and saved at the same time and / or according to the saved load information. The load information selects the operation of the upgrade time period. In short, the above-mentioned 3-step operations in this method are not uniquely arranged. The upgrade time ...