Method and apparatus for distributing channel resource
A channel resource and allocation method technology, which is applied in the field of channel resource allocation, can solve problems such as resource waste, and achieve the effect of improving resource utilization, capacity and call completion rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0059] Figure 5 It is a flowchart of a method for allocating channel resources when a new R4 service is accessed according to an embodiment of the present invention, as shown in Figure 5 As shown, when there is a new R4 service access, the following steps S501 to S507 are included:
[0060] Step S501, when there is a new R4 service access, determine whether the remaining idle resources among the resources fixedly allocated to the R4 service at the frequency point where the new R4 service currently needs to be accessed can meet the resource requirements of the new R4 service, If it can be satisfied, go to step S507; otherwise, go to step S502.
[0061] Step S502, judging whether there is an MBMS time slot preempted by the R4 service on the frequency point that the new R4 service currently needs to access, if so, proceed to step S503; otherwise, proceed to step S504.
[0062] Step S503: Select the time slot to be allocated for the new service according to the selected scheme...
example 2
[0069] Image 6 It is a flow chart of a method for allocating channel resources in a new MBMS access according to an embodiment of the present invention, as shown in Image 6 As shown, when there is a new MBMS access, the following steps S601 to S609 are included:
[0070] Step S601, when there is a new MBMS access, judge whether the available remaining idle MBMS resource can meet the resource requirement of the new MBMS on the frequency point that the new MBMS needs to access currently, if so, proceed to step S609 , otherwise, go to step S602.
[0071] Step S602, judging whether there is an MBMS time slot that has been preempted by the R4 service on the frequency point that the new MBMS currently needs to access, if yes, proceed to step S603; otherwise, proceed to step S610.
[0072]Step S603: Select the time slot to be used for the new service according to the selected plan. If the above-mentioned plan 1 is adopted, in the MBMS time slot preempted by the R4 service, the re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com