Construction method for underground continuous wall with conjoined reinforcing cage by topdown construction method

An underground diaphragm wall and steel cage technology, which is applied in excavation, artificial islands, water conservancy projects, etc., can solve the problems of long construction period, concrete bulge, unevenness, etc., and achieve the effect of reducing construction cost and improving project progress.

Inactive Publication Date: 2010-12-08
CHINA COAL NO 3 CONSTR GRP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0012] 2. Since the concrete walls of each unit section need to have continuity, each unit section can only be poured in sequence, and multiple unit sections cannot be constructed at the same time at intervals, so the construction period is longer
[0013] 3. The depth of the underground continuous wall varies from more than ten meters to tens of meters. If the concrete is poured at one time over the entire depth, the quality cannot be guaranteed, and voids are prone to occur
[0014] 4. Using the soil on both sides of the deep trench as a formwork, even if there is a mud retaining wall, it is inevitable that part of the soil will collapse. If the side close to the foundation pit collapses, the formed concrete will be bulging and uneven. At the same time, these If the package invades the main structure boundary of the building to be built, it needs to be chiseled

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for underground continuous wall with conjoined reinforcing cage by topdown construction method
  • Construction method for underground continuous wall with conjoined reinforcing cage by topdown construction method
  • Construction method for underground continuous wall with conjoined reinforcing cage by topdown construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0042] Example: see Figure 2A to Figure 4 , the underground diaphragm wall of the present invention adopts the reverse construction method, and the formed underground diaphragm wall has a conjoined reinforcement cage, and its construction process is carried out as follows:

[0043] ①. Delineate the width area of ​​the underground diaphragm wall to be built on the ground, Figure 4 The width area of ​​the diaphragm wall is indicated, and the area surrounded by the diaphragm wall is where the building to be built is located. After the diaphragm wall is formed, a deep foundation pit needs to be dug in this area;

[0044] ②, image 3 As shown, prepare the prefabricated pile 1, the two sides of the upper half or the upper 2 / 3 section of the pile body (depending on the depth ratio of the depth of the foundation pit and the bearing layer) are provided with pre-embedded ribs 11 protruding from the pile body, and the The pre-embedded reinforcement is bent and attached to the two sid...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for an underground continuous wall constructed by a reverse construction method and provided with a connected steel reinforcement cage, and the underground continuous wall formed by adopting the method. The continuous wall is provided with the connected steel reinforcement cage. Because a plain concrete area does not exist, cracks (penetrating the integral wall so as to cause wall collapse) are not caused, and the phenomenon of water leakage does not exist; the steel reinforcement cage is not integrally molded and hoisted into a deep groove, but is formed by welding in the dug deep groove, so a heavy crawler crane and the like are not needed, and the construction cost is lowered; and because the bottom end of a precast pile is already extended into a soil bearing layer and a soil lateral pressure acted on the continuous wall is finally born by the piles, the wall between the piles does not need to extend below a main body structural foundation pit of a building to be built, and large amount of material is saved.

Description

Technical field: [0001] The invention relates to a construction method of an underground diaphragm wall, in particular to a construction method of an underground diaphragm wall with a conjoined reinforcement cage constructed by an upside-down method. Background technique: [0002] The underground diaphragm wall is generally used for the support, enclosure and waterproofing of the foundation pit soil. When building a high-rise building on an open space surrounded by buildings, it is necessary to build an underground diaphragm wall around the excavated foundation before excavating the foundation. The existing building foundation is protected, and the construction steps of the formed underground diaphragm wall in the prior art are as follows: [0003] 1. According to the horizontal direction of the underground diaphragm wall, it is divided into several unit sections, and the construction of each unit section is carried out in sequence; [0004] 2. Concrete guide wall is poured...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/02E02D17/02
Inventor 丁飞李昌宇
Owner CHINA COAL NO 3 CONSTR GRP