Simulation and forecast evaluation method for delaying water inrush by mine fracture structure

A technology of fracture structure and evaluation method, which is applied in mining equipment, mining equipment, earth square drilling and mining, etc.

Inactive Publication Date: 2010-11-10
CHINA UNIV OF MINING & TECH (BEIJING)
View PDF1 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The first two methods are mainly based on the study of water inrush mechanism based on classical mechanical theory, but they have great limitations in the analysis of water inrush process and the determination of water inrush time; the latter method is based on the analysis of various water inrush It is a semi-empirical model determined by the comprehensive analysis and evaluation of risk influencing factors, which cannot even be called a mechanism study in a sense; (4) The previous understanding of water inrush in fault structures was to divide fault structures into water-conducting or water-repelling There are two types of faults, that is, if the mining face touches or approaches the water-conducting fault zone, water inrush or well flooding accidents will occur; if the mining face touches or approaches the water-resisting fault zone, no water inrush accidents will occur , the mining face can normally excavate forward
[0004] Although domestic and foreign scholars including the applicant have realized the delayed water inrush phenomenon in fault structures in recent years, and found that fluid-solid coupling plays an important role in simulating the water inrush process in fault zones, the application of this theory is limited to The elastic-plastic strain-seepage coupling simulation under the assumption that the fault zone material is an elastoplastic material and the rheology-seepage coupling simulation under the assumption that the fault zone material is a rheological material, while for considering stress-strain redistribution resulting in hydrogeological parameters The analysis of the occurrence mechanism and gestation process of delayed water inrush under changing conditions, the change of hydraulic properties of fracture structures over time due to the action of mining engineering, the evaluation of rheological-seepage coupling simulation with variable parameters, and the research on the prediction of delayed water inrush time are in the domestic market. There are few reports

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Simulation and forecast evaluation method for delaying water inrush by mine fracture structure
  • Simulation and forecast evaluation method for delaying water inrush by mine fracture structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0014] Mine fault structure delayed water inrush simulation prediction evaluation method, including:

[0015] 1. Propose an analysis method that considers the occurrence mechanism and gestation process of delayed water inrush and the hydraulic properties of fault structures that change with time due to the action of excavation engineering under the condition of hydrogeological parameter changes caused by stress-strain redistribution.

[0016] 2. Based on the coupling law of mechanical parameters and hydraulic parameters of rock mass, a simulation evaluation method of rheological-seepage coupling under variable parameter conditions is proposed.

[0017] The analysis method for the occurrence mechanism and gestation process of delayed water inrush and the hydraulic properties of fractured structures changing over time due to the action of excavation engineering under the condition of hydrogeological parameter changes caused by stress-strain redistribution is based on the water-ro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a simulation and forecast evaluation method for delaying water inrush by a mine fracture structure, comprising the follow steps: (1) putting forward an analysis method that mechanism for delaying water inrush, inoculation process and fracture structure hydraulic properties change with the time going because of the action of mining engineering under the condition of hydrogeological parameter variation due to stress strain redistribution; according to the water-rock interaction theory, analyzing circulation process of mutual action and mutual influence among stress, strain and permeance performance of the substances in fracture zone, and the genesis mechanism for hydraulic property conversion under the disturbance of the mining engineering; (2) according to the coupling rule of the mechanics parameters and the hydraulics parameter of the rock body, putting forward a rheology-seepage coupling simulation evaluation method under the variable parameter condition. The rheology-seepage coupling simulation evaluation method under the variable parameter condition builds the variable parameter rheology stress field and the seepage field coupling model by virtue of complying with the coupling rule of the mechanics parameters and the hydraulics parameter of the rock body, considering the substances in the fracture zone as rheopectic material, and basing on the rheological model of the rock body under the variable parameter condition.

Description

technical field [0001] The invention relates to a mine fault structure water inrush simulation prediction evaluation method, in particular to a mine fault structure delayed water inrush simulation prediction evaluation method. Background technique [0002] Mine water inrush is a serious underground disaster accident, which brings great harm to the mining of mineral resources, and causes a large number of economic losses and casualties every year. According to statistics, water inrush accidents related to fault structures account for 85% of the total water inrush accidents in my country, and with the increase of mine mining depth and the mining of lower coal groups, delayed water inrush accidents in fault zones with lag characteristics in time are becoming more and more serious. more and more. Delayed water inrush in the fault zone means that no signs of water inrush are found when the mining face touches or is close to a certain fault zone, but after a period of time after t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F17/00
Inventor 武强朱斌
Owner CHINA UNIV OF MINING & TECH (BEIJING)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products