[0017] Embodiment 1 is the high-speed railway culvert-culvert short-circuit foundation transition section structure in the embankment section, such as figure 1 As shown, it includes an inverted trapezoidal transition section and a transition section subgrade between culverts, wherein the inverted trapezoidal transition section is laid between the culvert 3 and the subgrade, and the transition section subgrade between the culverts is laid between two adjacent culverts 3 (ie figure 1 Between the two dotted lines in the middle), the culvert 3 is located in the embankment section, the above-mentioned inverted trapezoidal transition section and the subgrade of the transition section between culverts all include the surface layer 1 of the subgrade bed, the subgrade 7 of the transition section between culverts and the surface layer 1 of the subgrade bed below the surface layer 1 of the subgrade bed The inverted trapezoidal transition section 5 in the following part is filled with the ...
Embodiment 2
[0022] Embodiment 2 is the structure of the short-circuit foundation transition section between the culverts and culverts of the high-speed railway in the cutting section, such as figure 2 As shown, it includes an inverted trapezoidal transition section and a transition section subgrade between culverts, wherein the inverted trapezoidal transition section is laid between the culvert 3 and the subgrade, and the transition section subgrade between the culverts is laid between two adjacent culverts 3 (ie figure 2 The culvert 3 is located in the cutting section, and the foundation pit 4 on both sides of the culvert 3 is backfilled with concrete with strength above C25. The subgrade of the above-mentioned inverted trapezoidal transition section and the transition section between culverts include The surface layer 1, the subgrade 7 of the transition section between culverts below the surface layer 1 of the subgrade bed, and the inverted trapezoidal transition section 5 below the su...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com