Subgrade bed structure of high-speed railway red clay cutting
A high-speed railway, red clay technology, applied in the direction of roads, tracks, ballast layers, etc., can solve the problem of not meeting the requirements of dynamic stability of high-speed railway bedding, and achieve the effect of ensuring long-term dynamic stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Embodiments of the present invention will now be described with reference to the drawings, in which like reference numerals represent like elements. As mentioned above, the present invention provides a high-speed railway red clay cutting bed structure, which is stable in settlement and can meet the long-term dynamic stability requirements of high-speed railway roadbeds.
[0020] The technical solutions of the embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. figure 1 It is a structural schematic diagram of an embodiment of the high-speed railway red clay embankment structure of the present invention. Such as figure 1 As shown, the high-speed railway red clay road cutting foundation bed structure in this embodiment includes the foundation bed surface layer 1 and the foundation bed bottom layer 2 . A waterproof layer 3 is laid above the surface layer 1 of the foundation bed, a water-proof layer 4 is pro...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 