A Blasting Method for Improving Shovel Loading Efficiency in Open Pit Mine
A mine shovel and efficiency technology, which is applied in the blasting field to improve the shovel loading efficiency of open-pit mines, and achieves the effect of facilitating shovel loading and improving shovel loading efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2016-06-15
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of open-pit mining, in particular to a blasting method for improving shovel loading efficiency in open-pit mines. Background technique
[0002] The cost of open-air bench blasting mining includes four core parts: perforation, blasting, shoveling, and transportation. The costs are mutually restricted. The level of shoveling efficiency is directly linked to the transportation efficiency, which is particularly significant for reducing fuel consumption, power consumption, and improving productivity.
[0003] However, in the prior art, there is no systematic and feasible blasting technique to improve the efficiency of shoveling. Contents of the invention
[0004] The invention provides a blasting method for improving the efficiency of shoveling in an open-pit mine, which can improve the efficiency of shoveling.
[0005] In order to achieve the above object, the embodiment of the present invention improves the blasting m...
Examples
Embodiment Construction
[0024] A blasting method for improving shovel loading efficiency in open-pit mines according to an embodiment of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0025] It should be clear that the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
[0026] see figure 1 As shown, the present embodiment improves the blasting method of open-pit mine shovel loading efficiency, comprising steps:
[0027] S10, setting the blasting delay time of the hole network in the blasting area;
[0028] Through the blasting design platform, according to the pre-drawn blasting network diagram in the blasting area, set the blasting delay time of the hole network in the blasting area;
[002...