A kind of construction method of bridge pier cofferdam reinforcement structure
A technology for strengthening structures and construction methods, applied in basic structure engineering, construction, etc., can solve the problems of low sealing performance of cofferdams, extensive construction, long construction period, etc., and achieve the effect of low technical requirements, low difficulty and time saving for consignment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A bridge pier cofferdam reinforcement structure, comprising a cofferdam 19 formed by connecting a plurality of arc-shaped structural steel sheets 5 and cuboid structural steel sheets 20 . The top of the arc-shaped structural steel sheet 5 is a stepped upward convex structure, and the bottom is a stepped concave structure matching the top stepped shape; one side is a trapezoidal guide rail 6, and the other side is a dovetail groove 1 matching the trapezoidal guide rail 6 .
[0041] The top of the cuboid structural steel sheet 20 is a stepped upward convex structure, and the bottom is a step matching with the top stepped shape.
[0042] Trapezoidal concave structure; one side is the trapezoidal guide rail 6, and the other side is the dovetail groove 1 matched with the trapezoidal guide rail 6.
[0043] In addition, suspension rings 8 are provided alternately above and below the outside of the rectangular parallelepiped structural steel sheet 20 , and suspension rings 8 are...
Embodiment 2
[0055] A bridge pier cofferdam reinforcement structure includes a cofferdam 19 formed by connecting and surrounding a plurality of arc-shaped structural steel sheets 5 . The top of the arc-shaped structural steel sheet 5 is a stepped upward convex structure, and the bottom is a stepped concave structure matching the top stepped shape; one side is a trapezoidal guide rail 6, and the other side is a dovetail groove 1 matching the trapezoidal guide rail 6 .
[0056] In addition, suspension rings 8 are arranged alternately above and below the outside of the arc-shaped structural steel sheet 5 . The transition fit between the dovetail groove 1 and the trapezoidal guide rail 6, wherein: the dovetail groove 1 is also wound with a raw material belt.
[0057] The above-mentioned structure is based on the shape of the pier as a cylindrical pier and a square pier. The construction method of this structure includes the following steps,
[0058] (1) Transport a plurality of scattered arc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com