An update method and technology for inner pipelines, which are applied in pipeline laying and maintenance, pipes/pipe joints/fittings, machinery and equipment, etc., can solve problems such as the impact of pipeline replacement, and achieve the effects of convenient construction, avoiding disputes, and good social benefits.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] Embodiment 1 Pipeline update method from outdoor to indoor:
[0024] (1) Outdoor opening
[0025] The outdoor opening means excavating the working pit outdoors. According to the orientation of the pipeline, digging the working pit outdoors is convenient for drilling rig construction. The size of the working pit is set at 1500×1500×1000.
[0026] (2) Horizontal drilling
[0027] After the working pit is excavated, hoist the horizontal directional drilling equipment into the working pit with a crane, level it manually according to the requirements of the pipeline, install the guiding head on the front end of the drill pipe, cooperate with the guiding instrument to carry out drilling jacking, and strictly control the direction and elevation. Enter a drill pipe for inspection once, and adjust quickly if there is any deviation.
[0028] (3) Indoor opening
[0029] Indoor opening means vertical drilling indoors. This method adopts the non-excavation crossing construction m...
Embodiment 2
[0036] Embodiment 2 The pipeline update method from indoor to outdoor:
[0037] (1) Indoor opening
[0038] The indoor opening is the indoor inclined drilling. The inclination angle is 25 degrees. The equipment used when opening the indoor hole is a bolt drill, which is inclined to drill outwards. The diameter of the drilling hole is 200mm. The indoor opening is above the original riser elevation. Move 15cm.
[0039] (2) Horizontal drilling
[0040] Install the drill pipe at the front end of the rock bolter, install the guide head at the front end of the drill pipe, cooperate with the guiding instrument to carry out drilling jacking, strictly control the direction and elevation, check each time a drill pipe is jacked, and adjust it quickly if there is any deviation.
[0041] (3) Outdoor opening
[0042] The outdoor opening is to excavate the working pit outdoors. After the drill bit reaches the outdoor target position, the working pit is excavated around the drill bit. The ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com