Double-wall closed soil sampling method and device for soft soil
A double-walled, closed technology, applied in the field of foundation soil survey, construction, infrastructure engineering, etc., can solve the problems of secondary soil disturbance, lower soil shedding, lower sampling ratio, etc., to ensure the original traits, avoiding soil escape, and reducing disturbance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] A double-wall closed method for soil extraction for soft soil, the steps of which are:
[0037] 1) When in use, connect the outer layer sampling tube 1 and the inner layer sampling tube 2 to the joint 9 of the soil extractor, and fix them with connecting pins 8 . When taking soil, make the joint 9 of the soil fetcher be located at the upper part of the device, push the piston rod 7 from top to bottom, make the piston 6 be at the bottom of the sampling tube, and the bottom surface of the piston 6 is flush with the cutting edge of the outer layer sampling tube 1. The piston rod 7 is put into the soil layer to be sampled simultaneously with the drill rod of the drilling rig. Before lowering the soil extractor, the hole should be carefully cleaned. When the soil extractor is close to the depth of soil extraction, it should be lowered slowly to avoid pressure on the bottom of the sampling hole due to downward pressure or impact. When sampling, it is advisable to select the ...
Embodiment 2
[0045]A double-walled closed soil sampling device for soft soil, comprising an outer layer sampling tube 1, an inner layer sampling tube 2, a broken soil piece 3, a lifting rod 4, a connecting rod 5, a piston 6, a piston rod 7, a pin Sub 8, soil fetcher joint 9. Its connection relationship is: the outer layer sampling pipe 1 is a steel integral hollow regular pentagonal cylindrical casting, the outer layer sampling pipe 1 is connected with the lower part of the soil-taking tool joint 9, and is located at the outermost layer of the device, and the outer layer sampling pipe 1 and The inner layer sampling tube 2 is in contact with three pins 8 holes, the length of which exceeds the inner layer sampling tube 2, and the outer layer sampling tube 1 and the inner layer sampling tube 2 are connected via pins 8; the inner layer sampling tube 2 is connected by 5 The same rectangular steel plates are spliced together along the long sides. After being assembled, they are also hollow reg...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com