Engineering project element management method and system based on BIM

A technology of engineering projects and management methods, applied in the field of BIM-based management, can solve problems affecting project quality and normal progress, forgetting working conditions, etc., and achieve the effects of clear event management, cost reduction, and rich management methods and tools

Active Publication Date: 2015-07-08
SHANGHAI TONGZHU INFORMATION TECH
View PDF3 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Massive information is bound to be generated in the process of construction and management of construction projects, especially the management of quality, safety, environment and other working conditions and project progress. However, traditional project management methods often fail to record and communicate in time. Various factors cause the forgetting of the working conditions, thus affecting the quality and normal progress of the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project element management method and system based on BIM
  • Engineering project element management method and system based on BIM
  • Engineering project element management method and system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048]The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to protection domain of the present invention.

[0049] According to the management method of a BIM-based engineering project element provided by the present invention, it includes the following step :

[0050] step A: Save the first BIM model on the PC, and save the attribute data A of the first BIM model to the server through the PC. The attribute data includes component ID; simplify the first BIM model to obtain the second BIM model , and publish the second BIM model for mobile and / or WEB use, wherein, after simplification, the attribute data...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an engineering project element management method and system based on the BIM. The method includes the steps of storing attribute data A of a first BIM model in a server; simplifying the first BIM model to obtain and issue a second BIM model, wherein the association with the attribute data A in the server and the matching with the first BIM model in a PC terminal are achieved through the component ID; loading the second BIM model in a mobile terminal A, establishing the association relation between collected engineering project element information and the component ID, and achieving sharing through the server. By means of the association between the two BIM models and the component ID, data interaction and visual interaction are achieved.

Description

technical field [0001] The present invention relates to a BIM-based management method, in particular to a BIM-based engineering project element management method and system, and in particular to a BIM-based quality, safety, environment, and progress management method. Background technique [0002] BIM is the abbreviation of Building Information Modeling, which is usually translated into building information model in China. It is an information management technology for the whole life cycle of a building, which has five characteristics of visualization, coordination, simulation, optimization and drawing. BIM is a brand-new method of architectural design, construction, and management. Based on three-dimensional digital information technology, all data in planning, design, construction, and operation stages are included in the 3D model, allowing the entire life cycle of the building to When using the model, workers at any stage in the process can make effective and correct dec...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06F17/30
Inventor 尹仕友严国林
Owner SHANGHAI TONGZHU INFORMATION TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products