Electric power construction engineering data synchronization equipment

A technology of engineering data and electric power construction, applied in the direction of electrical components, transmission systems, etc., can solve the problems of high labor expenditure, high labor cost, and aggravated costs, etc., and achieve the effects of shortening the construction period, intuitive display, and convenient use

Inactive Publication Date: 2015-11-18
SHANGHAI MUNICIPAL ELECTRIC POWER CO
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] There are usually three units involved in electric power construction projects, namely the owner unit, the supervisor unit and the construction unit. Usually the construction unit is in the front line of the project. Although the supervisor unit and the owner unit are not in the front line, they are very concerned about the project. The progress of the project, especially the owner unit, is currently the usual practice. The supervisory unit and the owner unit send special personnel to track the progress of the project. The high manpower expenditure directly increases the cost. The docking personnel need to have high quality, and at the same time communicate with various teams in the progress of the project. Firstly, the labor cost is high, and secondly, it will distract the construction unit, which will further aggravate the owner's unit and the construction unit in terms of project progress. the contradiction between

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power construction engineering data synchronization equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

[0024] A power construction engineering data synchronization device, such as figure 1 As shown, it includes engineering data input device 1, database device 2, data forwarding device 3 and progress output device 4, one end of database device 2 is connected to engineering data input device 1, and the other end is connected to data forwarding device 3 and progress output device 4 respectively Connect, the engineering data input device 1 receives the engineering data provided by the construction unit, saves the engineering data received by the engineering data input device 1 in the datab...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to electric power construction engineering data synchronization equipment. The electric power construction engineering data synchronization equipment comprises an engineering data input device for receiving engineering data provided by a construction unit; a database device which is connected with the engineering data input device, and is used for saving the engineering data received by the engineering data input device; a data forwarding device which is connected with the database device, and is used for forwarding the engineering data to a supervising unit; and a progress output device which is connected with the database device, and is used for generating engineering progress information according to the engineering data in the database device, and forwarding the engineering progress information to an owner unit. Compared with the prior art, the electric power construction engineering data synchronization equipment has the advantages that the engineering data of the electric power construction engineering is saved in the database device and forwarded to the supervising unit, and meanwhile the engineering progress is presented to the owner unit instead of assignment of people for work report by the construction unit, so that distraction is avoided; the working efficiency of the construction unit is increased; and the construction period can be shortened.

Description

technical field [0001] The invention relates to a data synchronization technology, in particular to a data synchronization device for electric power construction projects. Background technique [0002] There are usually three units involved in electric power construction projects, namely the owner unit, the supervisor unit and the construction unit. Usually the construction unit is in the front line of the project. Although the supervisor unit and the owner unit are not in the front line, they are very concerned about the project. The progress of the project, especially the owner unit, is currently the usual practice. The supervisory unit and the owner unit send special personnel to track the progress of the project. The high manpower expenditure directly increases the cost. The docking personnel need to have high quality, and at the same time communicate with each team in the progress of the project. Firstly, the labor cost is high, and secondly, it will distract the constr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04L29/08
CPCH04L67/1095
Inventor 顾万里吴峻忻渊中周筱晟韩晔吴波
Owner SHANGHAI MUNICIPAL ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products