Asphalt core wall base and its construction method
A construction method and foundation technology, applied in water conservancy projects, marine engineering, coastline protection, etc., can solve the problem that earth-rock dams cannot be used for overflow, and achieve the effect of optimizing the layout of the hub, saving the construction period, and reducing the height.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below in conjunction with accompanying drawing.
[0023] Such as figure 1 As shown, the base of the asphalt core wall includes a base building surface 11 and a base body 12; the base building surface 11 is set on the bedrock 2, and the base body 12 is set on the base building surface 11, and the level of the top of the base body 12 is higher than the level of the foundation surface 21 of the dam; the level described herein refers to the height relative to the horizontal plane, for example, the level of the top of the base body 12 means The height of the top of the base body 12 relative to the horizontal plane. Wherein, there are multiple implementations of the foundation building surface 11 on the bedrock 2, for example: the foundation building surface 11 is arranged on the surface of the weakly weathered bedrock layer 22 in the bedrock 2, or it is arranged on On the surface of the bedrock 2 after the consolidation grout...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
