A technology for high-rise buildings and treatment methods, applied in construction, artificial islands, water conservancy projects, etc., can solve problems such as affecting the use function, seepage or gushing water, etc., to achieve the effect of safe and reliable use and reduced maintenance costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0026] The invention provides a construction treatment method for the settlement joint of the entrance and exit channel of the basement of a high-rise building. The method comprises the following steps:
[0027] Step 1: First install the steel plate waterstop and rubber waterstop near the entrance and exit of high-rise buildings;
[0028] 1) Steel plate waterstop installation
[0029] a. The steel plate waterstop must be welded to form a closed circle, and the weld must be full and dense, impermeable;
[0030] b. 1 / 2 width is pre-buried in the bottom wall panel close to the high-rise building, and the other 1 / 2 width exposed section is connected with the bottom wall panel structure of the entrance and exit passage;
[0031] c. The position is accurate, and the fixation must be firm and reliable;
[0032] d. The steel plate waterstop must be firmly welded to the main reinforcement of the bottom wall panel structure;
[0033] 2), rubber waterstop installation:
[0034] a. Th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com