Foundation bolt embedding construction die and foundation bolt adjusting construction method

An anchor bolt and pre-embedded technology, which is applied in basic structure engineering, construction and other directions, can solve the problems of poor pre-embedded construction accuracy, large number of anchor bolts, random construction operations, etc., to ensure the pre-embedded accuracy and the simple construction method. , The effect of processing is simple

Active Publication Date: 2016-12-07
CHINA RAILWAY 20 BUREAU GRP
View PDF11 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

But nowadays, when pre-embedding the anchor bolts, there is no unified, standard and standardized construction method to follow. During the construction process, there are inevitably relatively random construction operations, low construction efficiency, and poor pre-embedded construction accuracy. and other problems, coupled with the large number of anchor bolts that need to be embedded, the construction volume is very large
Moreover, there is a corresponding lack of a mold dedicated to the pre-embedded construction of the anchor bolts, which can easily and quickly locate the pre-embedded positions of the pre-embedded bolts and ensure the accuracy of the pre-embedded construction of the anchor bolts.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Foundation bolt embedding construction die and foundation bolt adjusting construction method
  • Foundation bolt embedding construction die and foundation bolt adjusting construction method
  • Foundation bolt embedding construction die and foundation bolt adjusting construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] like figure 1 , figure 2A pre-embedded construction mold for anchor bolts shown includes an upper horizontal plate 1, a lower horizontal plate 2 located below the upper horizontal plate 1, and a plurality of support members 3 supported between the upper horizontal plate 1 and the lower horizontal plate 2. The upper horizontal plate 1 and the lower horizontal plate 2 are arranged in parallel, and the two are fastened and connected by a plurality of supports 3; the upper horizontal plate 1 or the lower horizontal plate 2 is horizontally placed with a horizontal measuring ruler, the The horizontal measuring ruler comprises a cross-shaped flat plate 4 and two horizontal detection devices 5, and the cross-shaped flat plate 4 is formed by connecting a horizontal flat plate and a vertical flat plate, and the horizontal flat plate and the longitudinal flat plate are arranged on the same plane and both are arranged in the same plane. Arranged vertically, the two horizontal det...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a foundation bolt embedding construction die and a foundation bolt adjusting construction method. The foundation bolt embedding construction die comprises an upper horizontal plate, a lower horizontal plate and a plurality of supporting pieces supported between the upper horizontal plate and the lower horizontal plate. A horizontal measuring ruler is flatly placed on the upper horizontal plate or the lower horizontal plate. The upper horizontal plate is provided with one upper bolt installing hole set. The lower horizontal plate is provided with a lower bolt installing hole set. The number of bolt installing holes included in each of the upper bolt installing hole set and the lower bolt installing hole set is equal to the number of foundation bolts needing to be constructed. Structural steel rod pieces are fixed to the bottom of the lower horizontal plate. The construction method comprises the first step of surveying and setting out, the second step of die placing and primary foundation bolt installing, the third step of the first-time leveling, the fourth step of structural steel rod piece fixing, the fifth step of foundation bolt fixing and the sixth step of die dismounting. According to the foundation bolt embedding construction die and the foundation bolt adjusting construction method, the design is reasonable, construction is easy and convenient, the using effect is good, the foundation bolts needing to be constructed can be accurately positioned easily, conveniently and rapidly, and the foundation bolt adjusting construction process is easily and conveniently finished.

Description

technical field [0001] The invention belongs to the technical field of steel structure building construction, and in particular relates to an anchor bolt pre-embedded construction mold and an anchor bolt adjustment construction method. Background technique [0002] When constructing a steel structure factory building, the steel structure system and the foundation of the steel structure factory building are usually fixedly connected by pre-embedded anchor bolts. In the steel structure system of the steel structure factory building, each steel column is supported on an independent foundation. The independent foundation is a reinforced concrete foundation. Each steel column and the supported independent foundation are fixed by a pre-embedded bolt group. The pre-embedded bolt The group usually includes four embedded bolts respectively arranged on the four vertices of a rectangle. For steel columns of different sizes, the spacing of the embedded bolts in the embedded bolt group ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/42
CPCE02D27/42E02D2250/0007
Inventor 吴应明仲维玲郭朋超朱红桃
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products