A Construction Method of Sprinkling Concrete in Slope Shoulder Stone Gap Gap
A construction method and technology of stone materials, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as prone to collapse, and achieve the effect of resisting wave erosion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Such as Figure 1 to Figure 5 Shown, be a kind of slope shoulder stone gap spraying concrete construction method of the present invention, comprise the steps:
[0031] (a) Slope shoulder stone area division: between the area divisions, the slope surface can be cleaned, the loose pumice and rock slag on the slope surface should be removed, the obstacles on the slope surface should be removed, and then stone blocks can be used to repair Then use a backhoe excavator to level and compact the surface of the stone to be sprayed to improve the compactness of the slope to be sprayed and facilitate the later treatment and construction of the slope.
[0032] Divide the entire slope shoulder into a first stone area and a second stone area, the divided first stone area is close to the river bank, and the divided second stone area is far away from the river bank. In the process of dividing the shoulder stone area, a protective fence is built at the outer 5m of the first stone area ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com