Integrated water conservancy engineering construction management system based on big data analysis and internet of things

A water conservancy project and comprehensive system technology, applied in data processing applications, recording/indicating event time, instruments, etc., can solve problems such as reducing corporate profits, having no reference basis for construction progress, and affecting project progress, etc., to improve work Efficiency and the effect of automatic supervision and management

Inactive Publication Date: 2017-12-15
SICHUANG TECH CO LTD
View PDF6 Cites 26 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The project construction of water conservancy projects generally involves institutions such as project legal person, supervision unit, survey and design unit, quality supervision, construction unit, etc. However, as far as the construction and construction of some domestic water conservancy projects are concerned, there is no relationship between the various institutions involved in the project. Straightening out, responsibilities are not clear enough, and there is no reference basis for the construction progress, which leads to repeated revisions of the construction plan and repeated delays in the work, seriously affecting the progress of the project
On the other hand, during the construction process of the project, the management of capital costs has not been reasonably predicted and the actual cost of expenditure has not been calculated, which has led to the continuous increase in the cost of the construction company and reduced the profit of the company.
At the same time, due to its unique structural characteristics, water conservancy projects need to consume a lot of construction materials and human resources. The cost of materials accounts for about 60% of the total cost of the pro

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated water conservancy engineering construction management system based on big data analysis and internet of things
  • Integrated water conservancy engineering construction management system based on big data analysis and internet of things
  • Integrated water conservancy engineering construction management system based on big data analysis and internet of things

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The technical solution of the present invention will be specifically described below in conjunction with the accompanying drawings.

[0026] The present invention provides a water conservancy project construction management comprehensive system based on big data analysis and the Internet of Things, combined with the high standard requirements of national water conservancy project construction management and the actual needs of construction units, construction units, supervision units, quality supervision and other institutions, in the present Under certain organizational systems and management methods, build application systems such as data mining systems and information collection networks to realize unified management of on-site construction units and on-site materials, and realize project progress and cost prediction and comparison through big data analysis technology. The system conducts real-time supervision through a combination of multiple means. The system compr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an integrated water conservancy engineering construction management system based on a big data analysis and the internet of things. The system is composed of an information acquisition and preprocessing module for collecting and preprocessing construction material information and construction personnel information, a data resource module, a service application module for providing construction management information, and a visiting user management module for providing access to a visiting user. According to the system provided by the invention, completed file data are collected while construction of one project is completed and thus the reference basis is provided for follow-up progress and cost management of the engineering construction project. Meanwhile, the management and supervision on the quality guarantee of the construction material and the daily working behavior of the construction staff are realized, so that the water conservancy engineering construction management is carried out normatively in order.

Description

technical field [0001] The invention relates to a comprehensive water conservancy project construction management system based on big data analysis and the Internet of Things. Background technique [0002] In the field of water conservancy project construction, there are a series of problems in the construction management of current projects, which are mainly reflected in quality management, progress management, and capital cost management. The project construction of water conservancy projects generally involves institutions such as project legal person, supervision unit, survey and design unit, quality supervision, construction unit, etc. However, as far as the construction and construction of some domestic water conservancy projects are concerned, there is no relationship between the various institutions involved in the project. Straightening out, responsibilities are not clear enough, and there is no reference basis for the construction progress, which leads to repeated ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G07C1/10
CPCG06Q10/0637G06Q10/103G06Q50/08G07C1/10
Inventor 林灿文陈敬雄徐能通江峰
Owner SICHUANG TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products