Multi-target highway toll station regular bus scheduling method considering transfer
A high-speed toll station and multi-objective technology, which is applied in the field of multi-objective high-speed toll station shuttle scheduling considering transfers, can solve the problems of low service rate, limited scale of shuttle bus fleet, unsatisfied employees' needs, etc., and achieve scientific management effective effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Based on the given road network topology information, travel demand information and vehicle information, the proposed multi-stage heuristic algorithm for the shuttle scheduling method at high-speed toll stations considering transfer is shown in the diagram. figure 1 The specific solution steps are as follows:
[0052] Step S1, based on the space-time capability constraints, generate a set of bus lines at the high-speed toll station and the initial time of each line.
[0053] The following space-time capacity constraints are considered in the intelligent route search for the high-speed toll station shuttle routes:
[0054] (1) Maximum number of vehicles. Since the number of vehicles has a high impact on the travel time, the number of vehicles in the original bus running scheme (or the initial construction solution) is used in the preliminary optimization scheme.
[0055] (2) Starting point setting. All shuttles depart from the designated residential nodes, and the sta...
Embodiment 2
[0080] Step 1: Generate a set of high-speed toll station bus lines and the initial time of each line based on the space-time capability constraints.
[0081] The feasible route is searched considering the maximum number of vehicles, the setting of the starting and ending points, the line length constraints, and the network coverage constraints. In this case, the number of vehicles using the original shuttle bus scheme in the preliminary optimization plan is 8; the starting point is consistent with the original plan, of which 4 vehicles depart from city A and receive vehicles (including electric vehicles), and 2 vehicles depart from city B To close the bus, there are 1 bus in City C and City D; the end point of the bus can be set at any working node; the length of the line is set to 4-10 stops (one-way).
[0082] Specify a unified latest arrival time t w , reserved time t r and the maximum transfer waiting time t trans . Initialize the arrival time of the line terminal stat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com