A flood control scheduling method for cascade reservoirs in the upper reaches of the Yellow River considering early warning
A technology for flood control scheduling and cascade reservoirs, which can be used in forecasting, data processing applications, instruments, etc., and can solve the problem that risk analysis is difficult to apply to flood control scheduling.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0081]The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0082] The invention provides a flood control dispatching method for cascade reservoirs in the upper reaches of the Yellow River considering early warning, comprising the following steps,
[0083] Step 1: Establish an early warning system for flood control of cascaded reservoirs in the upper reaches of the Yellow River
[0084] Such as figure 1 As shown, the present invention uses fuzzy set theory to establish a flood control early warning system for cascade reservoirs in the upper reaches of the Yellow River. The system consists of four parts, namely evaluation factors, early warning indicators and early warning indexes, early warning information, and early warning countermeasures. Each part is described in detail below.
[0085] Evaluation factor selection
[0086] The primary task of reservoir flood control scheduling is to ensure the fl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com