Yellow River upstream cascade reservoir flood control scheduling method considering early warning

A technology of flood control dispatching and cascade reservoirs, which is applied in forecasting, instrumentation, climate change adaptation, etc., and can solve problems such as risk analysis that is difficult to apply to flood control dispatching

Active Publication Date: 2018-01-12
XIAN UNIV OF TECH
View PDF0 Cites 28 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a flood control scheduling method for cascade reservoirs in the upper reaches of the Yellow River that considers early warning, which solves the problem in the prior art that the complex water system flood control scheduling and flood control early warning are separated from each other, and risk analysis is difficult to apply to flood control scheduling.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Yellow River upstream cascade reservoir flood control scheduling method considering early warning
  • Yellow River upstream cascade reservoir flood control scheduling method considering early warning
  • Yellow River upstream cascade reservoir flood control scheduling method considering early warning

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0081]The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0082] The invention provides a flood control dispatching method for cascade reservoirs in the upper reaches of the Yellow River considering early warning, comprising the following steps,

[0083] Step 1: Establish an early warning system for flood control of cascaded reservoirs in the upper reaches of the Yellow River

[0084] Such as figure 1 As shown, the present invention uses fuzzy set theory to establish a flood control early warning system for cascade reservoirs in the upper reaches of the Yellow River. The system consists of four parts, namely evaluation factors, early warning indicators and early warning indexes, early warning information, and early warning countermeasures. Each part is described in detail below.

[0085] Evaluation factor selection

[0086] The primary task of reservoir flood control scheduling is to ensure the fl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a Yellow River upstream cascade reservoir flood control scheduling method considering early warning. The Yellow River upstream cascade reservoir flood control scheduling methodis characterized by comprising the following steps that 1, a Yellow River upstream cascade reservoir flood control early-warning system is established; 2, a cascade reservoir flood control schedulingmodel based on the early-warning system established in the step 1 is established; 3, optimizing calculation is conducted on the flood control scheduling model established in the step 2, and a scheduling result and an optimal early-warning decision are output. The Yellow River upstream cascade reservoir flood control scheduling method considering early warning combines with the cascade reservoir united flood control scheduling model to assess the flood control risk degrees of a reservoir and a downstream protective object and determine the comprehensive risk degree and flood control early-warning level, future time period prediction information is utilized to formulate a reasonable and effective early-warning strategy, and the flood control early-warning system suitable for a Yellow Riverupstream cascade reservoir group is established.

Description

technical field [0001] The invention belongs to the technical field of flood control scheduling methods, and in particular relates to a flood control scheduling method for cascaded reservoirs in the upper reaches of the Yellow River considering early warning. Background technique [0002] Flood is one of the major natural disasters that threaten the safety of human life and social stability. In recent years, extreme flood events have occurred frequently and serious disasters have occurred. The issue of flood control and disaster reduction has received close attention. Reservoirs are an important engineering measure to resist flood disasters and have played an important role in flood control and disaster reduction. With the improvement of hydrological monitoring and reservoir operation and management, the thinking of water control in the new era has changed. While engineering construction, we should strengthen Use of non-engineering measures. Non-engineering measures for flo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCY02A10/40
Inventor 畅建霞孟雪姣王义民王学斌
Owner XIAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products