Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Arranging method of pile-plate retaining wall and culvert combination

A layout method and culvert technology, applied in the field of geotechnical engineering, can solve problems such as long-term safety hazards of engineering stability, deterioration of subgrade stability, and difficult sliding force of gravity retaining walls, so as to achieve good implementation effects and avoid connection difficulties and conflicts Problems, Effects of Cost Economy

Active Publication Date: 2018-04-27
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Replacing the subgrade pile-slab retaining wall with a gravity retaining wall, the connection between the gravity retaining wall and the culvert can solve the problem of the connection with the culvert. Larger, the gravity retaining wall is difficult to withstand a large sliding force, and slope filling or other anti-sliding auxiliary measures have to be taken, which may leave a safety hazard to the long-term stability of the project
Adjusting the position of the culvert or canceling the setting of the culvert will affect the drainage effect of the high-fill roadbed on steep slopes to varying degrees, causing water accumulation and siltation to soften the base layer of the roadbed, thereby deteriorating the stability of the roadbed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Arranging method of pile-plate retaining wall and culvert combination
  • Arranging method of pile-plate retaining wall and culvert combination
  • Arranging method of pile-plate retaining wall and culvert combination

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] The present invention will be further described in detail below in conjunction with specific embodiments.

[0048] As above Figure 1~3 Shown is an arrangement method of pile-slab retaining wall and culvert combination, including the following steps:

[0049] 1) Construction of culvert engineering: Determine the culvert center mileage X, culvert width D, and culvert angle α according to the conditions of flood discharge, irrigation, traffic and terrain, and make culvert engineering according to the design. The related requirements of culvert construction must meet the technical requirements of culvert design , The culvert structure needs to meet the requirements of the additional load of the retaining plate;

[0050] 2) The construction of the anchor pile body of the pile-slab retaining wall: According to step 1) the culvert center mileage X, the culvert width D, and the culvert angle α determine the small mileage direction of the anchor pile center mileage K 1 、Large mileage...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an arranging method of a pile-plate retaining wall and culvert combination. The arranging method includes following steps: 1), determining central mileage X, width D and anglealpha of a culvert; 2), determining small-mileage direction pile central mileage K1, large-mileage direction pile central mileage K2 and pile central spacing L of anchoring piles; 3), determining pilethickness d and pile width b of the anchoring piles on two sides of the culvert until shearing-resistant and bending-resistant inspection and calculation requirements of the pile-plate retaining wall, and arranging corresponding anchoring piles on two sides of the culvert; 4), according to structural stress design of the culvert, arranging a corresponding soil retaining plate on the top face at an outlet end of the culvert; 5), sealing or filling gaps between an outlet structure of the culvert and adjacent anchoring piles and the soil retaining plate. The arranging method meets technical requirements on antiskid stability of a steep-slope roadbed and flood drainage, irrigation and traffic of the culvert and avoids the problems of difficulty and conflict in linking the pile-plate retainingwall and the culvert.

Description

Technical field [0001] The invention relates to the technical field of geotechnical engineering, in particular to an arrangement method for the combination of a pile-slab retaining wall and a culvert. Background technique [0002] When railway and highway projects pass through steep slopes and high filling sections, subgrade projects often need to set up pile-slab retaining walls to support and rewind the slope, meet the anti-sliding stability requirements of subgrade projects, and avoid the existence of slopes and high filling subgrades to reduce or eliminate Hidden engineering hazards; at the same time, in order to meet the requirements of flood discharge, irrigation and traffic, culvert projects need to be set up in the area at the same time. However, conflicts often arise due to the difficulty in connecting the pile-slab retaining wall and the culvert. In the past, only one of the two can be used in the design, which may leave long-term safety hazards to the project. [0003] ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01F5/00E02D17/20E02D29/02
Inventor 詹学启王欢李传宝薛峰李东黎彭志鹏徐彩风
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products